Tenders : किरु-कवार परियोजनाएं, किश्तवाड़

निविदा संख्या निविदा विवरण अधिसूचना दिनांक अंतिम तिथि दस्तावेज़
CVPP/kiru/M(C&P)/NIT-25/2018/39Repairing and Painting work of Kiru Office Building at Kishtwar
08-Feb-2018 28-Feb-2018निविदाएं बंद
CVPP/Kwar/Civil/Lot I/2017"Construction of Diversion Tunnel, Concrete Gravity Dam, Intake, Pressure Shafts, Underground Power House & Tailrace Tunnels" for Kwar HE Project (Lot 1) in district Kishtwar, J&K India.

Corrigendum-1
Corrigendum-2
Corrigendum-3
Corrigendum-4
Corrigendum-5
Corrigendum-6
Corrigendum-7
Corrigendum-8
Corrigendum-9
Corrigendum-10
Corrigendum-11
Corrigendum-12
Corrigendum-13
Corrigendum-14
Corrigendum-15
Corrigendum-16
Cancellation of Tender  NEW
01-Aug-2017 14-Jun-2018निविदाएं बंद
CVPP/KK/M/NIT-10/2017/449Installation of Local Area Network (LAN) in KK HEP Office Kishtwar
28-Jun-2017 18-Jul-2017निविदाएं बंद
CVPP/KK/M(C&P)/NIT-09/2017/437Development of benches(Size: 60 x 10m and 40 x 10m) including protection & drainage work and construction of single lane internal road RD 0 to 570m long for Field hostel & Site offices near Dam site of Kiru H.E Project, Kishtwar.

Corrigendum-1
Corrigendum-2  NEW
17-Jun-2017 08-Jul-2017निविदाएं बंद
CVPP/KK/SM/NIT-08/2017/417Demarcation of Project area of Kiru HEP with Burjis
31-May-2017 20-Jun-2017निविदाएं बंद
CVPP/CO/Cont-II/2017/087Consultancy Services for Planning, Architectural and Structural Design, Estimation for Comprehensive Plan regarding Infrastructure Development of common facilities for Pakal Dul, Kiru and Kwar HE Projects at Dul Colony Kishtwar, J&K.

Corrigendum-1
Corrigendum-2  NEW
25-May-2017 30-Jun-2017निविदाएं बंद
CVPP/KK/SM(C&P)/NIT-03/2017/368Construction of Road to Dam Top from PMGSY Chichha Road (RD 2350m) of Kiru H.E Project
16-Mar-2017 23-Mar-2017निविदाएं बंद
CVPP/KK/SM(C&P)/NIT-07/336Upkeeping of Padyarna Office by way of Cleaning, Sweeping, Dusting of Furniture, Fixtures, Cleaning of toilets etc.
23-Feb-2017 15-Mar-2017निविदाएं बंद
CVPP/KK/SM(C&P)/NIT-06/17/335Taking Cross Section and marking of G&D site of Kiru and Kwar HE Projects
23-Feb-2017 03-Mar-2017निविदाएं बंद
CVPP/KK/SM(C&P)/NIT-04/2017/331Diamond Core Drilling including reaming of drill hole at RD+-162m in P/H drift including Core preservation, water percolation test as per GSI & IS code recommendations for Kru H.E Project, Kishtwar.
22-Feb-2017 02-Mar-2017निविदाएं बंद
CVPP/KK/SM(C&P)/NIT-05/2017/332Conducting Survey Work for Data Requirement for Kiru H.E Project-Civil Works Package (Lot-1) Regarding Construction Stage Drawings & Hydraulic Model Studies for Kiru H.E.P, Kishtwar
22-Feb-2017 01-Mar-2017निविदाएं बंद
CVPP/KK/SM(C&P)/NIT-03/2017/327Construction of Road to Dam Top from PMGSY Chichha Road (RD 2350m) of Kiru HE Project, Kishtwar.

Corrigendum-1  NEW
17-Feb-2017 02-Mar-2017निविदाएं बंद
CVPP/KK/SM/NIT-02/2017/323Taking Observation of Gauge & Discharge of River Chenab at One Location at Kwar and at Two Locations at Kiru regularly, Hydro Metrological data and Collection of water samples of River Chenab for silt concentration of Kiru & Kwar HE Projects.
15-Feb-2017 08-Mar-2017निविदाएं बंद
CVPP/Cont-II/KIRU/Lot-03/003Design, Manufacture, Supply, Erection, Testing and Commissioning of Turbines, Generators, Associated Accessories and Auxiliaries, Auxiliary Electrical Equipment, Mechanical Equipment, 400 KV GIS, 400 KV Outdoor Pothead Yard Equipments and handing over to Employer all E&M equipment of 4 x 156 MW Kiru Hydroelectric Project.

Corrigendum-1
Corrigendum-2
Corrigendum-3
Corrigendum-4
Corrigendum-5
Clarifications/replies to Pre Bid Queries of all bidders
Corrigendum-6
Corrigendum-7
Clarifications/Replies
Corrigendum-8
Corrigendum-9
Corrigendum-10
Clarifications/ Replies
Corrigendum-11
Corrigendum-12
Corrigendum-13
Corrigendum-14
Corrigendum-15
Clarifications/Replies
Corrigendum-16
Corrigendum-17
Clarification/replies  NEW
15-Feb-2017 13-Nov-2017निविदाएं बंद
CVPP/Cont-II/KIRU/Lot-02/002Construction of Kiru HM Works comprising of Radial Gates, Vertical Gates, Stoplogs, Gantry Cranes, Trashracks, Trashrack Cleaning Machine, Steel liner for Pressure Shafts etc.

Corrigendum-1
Corrigendum-2
Corrigendum-3
Corrigendum-4
Corrigendum-5
Corrigendum-6
Corrigendum-7
Corrigendum-8
Corrigendum-9
Corrigendum-10
Corrigendum-11
Corrigendum-12
Corrigendum-13
Corrigendum-14  NEW
07-Nov-2016 17-Apr-2017निविदाएं बंद
CVPP/KK/GM/NIT-01/2016/242Construction of Road from PMGSY''s Galhar to Chicha Road to DT Inlet & Outlet of Kiru HE Project, Kishtwar.
03-Nov-2016 24-Nov-2016निविदाएं बंद
CVPP/KK/SM(C&P)/NIT-01/16/227Upkeeping of KK Projects Administrative Building by way of Cleaning, Sweeping, Dusting of Furniture, Fixtures, Cleaning of Toilets etc.
30-May-2016 24-Jun-2016निविदाएं बंद
CVPP/KK/SM(C&P)/NIT-02/15/126Upkeeping of Padyarana Office by way of cleaning,sweeping,dusting of furniture and cleaning of toilets and providing of Attendants/Helpers for Kiru & Kwar Sites.

Corrigendum  NEW
13-Oct-2015 03-Nov-2015निविदाएं बंद
CVPP/KK/SM(C&P)/NIT-01/15/108Observation of River Chenab by taking Gauge reading regularly at One location at Kwar and at Two locations at Kiru.
09-Sep-2015 30-Sep-2015निविदाएं बंद
CVPP/Contracts/KIRU/MW/2015/Lot-01Civil Works for Construction of Diversion Tunnel, Concrete Gravity Dam, Intake, Pressure Shafts, Underground Power House and Tail Race Tunnels of Kiru HE Project (Lot-01)

Corrigendum-I
Corrigendum-II
Corrigendum-III
Tender Information Notice
Corrigendum-1
Corrigendum-2
Corrigendum-3
Corrigendum-4
Corrigendum-5
Corrigendum-6  NEW
10-Aug-2015 23-Sep-2015निविदाएं बंद
CVPP/KK/SM(C&P)/NIT-01/15/080Observation of River Chenab by taking Gauge reading regularly at one location at Kwar and at Two locations at Kiru

Corrigendum  NEW
06-Jul-2015 28-Jul-2015निविदाएं बंद
CVPP/KK/SM(C&P)/NIT-12/14/257Upkeeping of KK Projects Administrative Building by way of cleaning,sweeping,dusting of furniture,fixtures,cleaning of toilets etc.
08-Dec-2014 07-Jan-2015निविदाएं बंद
CVPP/KK/SM(C&P)/NIQ-01/2014/170PURCHASE OF PORTABLE MAGAZINES FOR KIRU AND KWAR HE PROJECTS
16-Jul-2014 06-Aug-2014निविदाएं बंद
CVPP/KK/SM(C&P)/NIT-10/14/132Providing Barbed wire Fencing/Concertina Coil and Construction of Pedestal & Roof Cover Passage for Portable magazine shed near CISF Camp at DUL Dam for Kiru & Kwar HE Projects
08-May-2014 29-May-2014निविदाएं बंद
CVPP/KK/SM(C&P)/NIT-11/14/133Upkeeping of Padyarana Office by way of cleaning, sweeping, dusting of furniture and cleaning of toilets and providing of Attendants/ Helpers for Kiru & Kwar Sites.
08-May-2014 29-May-2014निविदाएं बंद
CVPP/KK/SM(C&P)/NIT-08/14/103Performance of Groutability Test to access the efficiency of grouting at suitable location around 25-30 m U/S of Dam axis of Kiru HE Project.
07-Apr-2014 28-Apr-2014निविदाएं बंद
CVPP/KK/SM(C&P)/NIT-09/14/104Performance of Groutability Test to assess the efficiency of grouting at suitable location around 25-30 m U/S of Dam axis of Kwar HE Project.
07-Apr-2014 28-Apr-2014निविदाएं बंद
CVPP/KK/SM(C&P)/NIT-07/14/064Hiring of Vehicles (2014 Make or New Model) Two No.Mahindra Bolero ZLX for a period of 2 Years

CORRIGENDUM-01
Corrigendum-02  NEW
01-Mar-2014 24-Apr-2014निविदाएं बंद
CVPP/KK/SM(C&P)/NIT-06/14/046Geological Exploration by driving 1 No. of drift DR-4, at EL 1370m, on Right abutment, length; 20+5m cross cuts each towards U/S & D/S direction (Cumulative length 50m) of size 1.52m(width) x 2.13(height) rectangular section for Kwar HE Project.

CORRIGENDUM-01
CORRIGENDUM-02  NEW
13-Feb-2014 29-Apr-2014निविदाएं बंद
CVPP/KK/SM(C&P)/NIT-05/14/045Geological Exploration by driving 1 No. of drift DL-3, at EL 1370m, on Left abutment, length; 20+5m cross cuts each towards U/S & D/S direction (Cumulative length 50m) of size 1.52m(width) x 2.13(height) rectangular section for Kwar HE Project

CORRIGENDUM-01
CORRIGENDUM-02  NEW
13-Feb-2014 29-Apr-2014निविदाएं बंद
CVPP/KK/SM(C&P)/NIT-04/14/044Geological Exploration by driving 1 No. of drift DR-3, at EL 1485m, on Right abutment, length; 30+5m cross cuts each towards U/S & D/S direction (Cumulative length 70m) of size 1.52m(width) x 2.13(height) rectangular section for Kiru HE Project

CORRIGENDUM-01
CORRIGENDUM-02  NEW
13-Feb-2014 29-Apr-2014निविदाएं बंद
CVPP/KK/SM(C&P)/NIT-03/14/021Geological Exploration by driving 1 No. of drift GL-3, at EL 1485m, on left abutment, length; 30+5m across cuts each towards U/S & D/S direction (Cumulative length 70m) of size 1.52m(width) X 2.13 (height) rectangular section for Kiru HE Project.

CORRIGENDUM-01
CORRIGENDUM-02
CORRIGENDUM-03  NEW
25-Jan-2014 29-Apr-2014निविदाएं बंद
CVPP/KK/SM(C&P)/NIT-02/14/009Supply of Computers and Printers in KK Administrative Building,Kishtwar.

Corrigendum 01  NEW
10-Jan-2014 31-Jan-2014निविदाएं बंद
CVPP/KK/SM(C&P)/NIT-01/2014/003Providing and Fixing of Chain link fabric fencing for protection of All Weather Station at Pathernaki
08-Jan-2014 31-Jan-2014निविदाएं बंद
CVPP/KK/SM(C&P)/NIT-10/13/100Exploration of rock at Kwar by Diamond core of drilling including driving, reaming for lowering of casing of NX & BX size for +- 250 mtr, deep hole along with permeability test at alternative site of power house (TRT Outlet, EL 1470 M)
11-Nov-2013 02-Dec-2013निविदाएं बंद
CVPP/KK/SM(C&P)/NIT-09/13/081Providing and Fixing work of Roof cover passage in Kiru & Kwar Administrative building Kishtwar
18-Oct-2013 07-Nov-2013निविदाएं बंद
CVPP/KK/SM(C&P)/NIT-08/13/077Observation of Gauge Reading at River Chenab and taking gauge reading regularly at two locations at Kwar and one location at Kiru.
18-Oct-2013 07-Nov-2013निविदाएं बंद
CVPP/KK/SM(C&P)/NIT-06/13/072Topographical Survey Including Control Survey of KIRU HE PROJECT
17-Oct-2013 06-Nov-2013निविदाएं बंद
CVPP/KK/SM(C&P)/NIT-07/13/073Topographical Survey Inculding Control Survey of KWAR HE PROJECT
17-Oct-2013 06-Nov-2013निविदाएं बंद
CVPP/KK/SM(C&P)/NIT-05/13/068Diamond Core Drilling Including Driving, Reaming and Permeability/Percolation Test of Three holes(Two drill holes along dam axis and one drill hole in bucket area) for Kwar HE Project.

CORRIGENDUM-1  NEW
11-Oct-2013 08-Nov-2013निविदाएं बंद
CVPP/KK/SM(C&P)/NIT-04/13/066Diamond Core Drilling Including Driving,Reaming and Permeability/Percolation test of three holes (Two drill holes along dam axis and One drill hole in bucket area) for Kiru HE Project.

CORRIGENDUM-1  NEW
10-Oct-2013 08-Nov-2013निविदाएं बंद
CVPP/KK/SM(C&P)/NIQ-01/2013/046NIQ for Plate Load Test and Other Laboratory Tests at GIS & Pothead Yard Location

CORRIGENDUM-1  NEW
26-Sep-2013 06-Nov-2013निविदाएं बंद
CVPP/KK/SM(C&P)/NIT-03/13/041Supply including installation of E-attendance System for Administrative Building Kiru & Kwar HE Projects Kishtwar.

CORRIGENDUM - 01
CORRIGENDUM-2
CORRIGENDUM-03  NEW
23-Sep-2013 05-Dec-2013निविदाएं बंद
CVPP/KK/SM(C&P)/NIT-02/13/010Notice Inviting Tender for Upkeeping of KK Projects Administrative Building by Cleaning, sweeping, dusting of furnitures, fixtures, cleaning of toilets etc. and Upkeeping and HouseKeeping of Field Hostel/Transit Camp including providing of mess services.

CORRIGENDUM-1  NEW
12-Aug-2013 17-Sep-2013निविदाएं बंद
CVPP/KK/PROC/2013/NIQ/007NIQ for Supply of Cartridges/Toners for Kiru & Kwar H.E. Projects, Kishtwar.

CORRIGENDUM-1  NEW
07-Aug-2013 06-Sep-2013निविदाएं बंद
CVPP/KK/SM(C&P)/NIT-01/13/003Notice Inviting Tender for Hiring of Vehicles (One no: Tata safari Dicor 2.2 VX 4x4, One No.- Mahindra Scorpio LX 4x4 , Two nos. Mahindra Bolero ZLX) Brand New/2013 model for a period of 2 years (24 months) for Kiru and Kwar HE Projects, Chenab Valley Power Projects (P) Ltd, Kishtwar.

Correction in Newspaper Publication
CORRIGENDUM-1
CORRIGENDUM-2
CORRIGENDUM-4
CORRIGENDUM-5  NEW
05-Aug-2013 04-Oct-2013निविदाएं बंद
CVPP/KIRU/MW/ 2012/ Lot 03Invitation For Prequalification (ICB) for the E&M works (Lot-3) of Kiru Hydroelectric Project, 660 (4 X 165) MW.

CORRIGENDUM-1  NEW
29-Nov-2012 07-Jan-2013निविदाएं बंद
CVPP/KIRU/MW/ 2012/ Lot 02Invitation For Prequalification (ICB) for the HM works (Lot-2) of Kiru Hydroelectric Project, 660 (4 X 165) MW.

CORRIGENDUM-1
CORRIGENDUM-2
CORRIGENDUM-3
CORRIGENDUM-4  NEW
29-Nov-2012 28-Jan-2013निविदाएं बंद
CVPP/KIRU/MW/ 2012/ Lot 01Invitation For Prequalification (ICB) for the Civil works (Lot-1) of Kiru Hydroelectric Project, 660 (4 X 165) MW

CORRIGENDUM-1  NEW
29-Nov-2012 07-Jan-2013निविदाएं बंद

2013 से पहले जारी एनआईटी के लिए यहां क्लिक करें