Tenders : पकल दुल जल विद्युत परियोजना, किश्तवाड़

निविदा संख्या निविदा विवरण अधिसूचना दिनांक अंतिम तिथि दस्तावेज़
CVPPPL/PDHEP/C&P/NIT-286/2024/977 Date – 22.03.2024Electrification of Rooms of Field Hostel, Dining Hall of Field Hostel and Washrooms of Office Complex at Pakal Dul H.E. Project, Kishtwar, J&K.
22-Mar-2024 12-Apr-2024
CVPPPL/PDHEP/C&P/NIT- 285/2024/967 Dated:21.03.2024River Bank Protection/Road Protection Works Near Bhandarkoot Bridge for Road Connecting Dam Site of Pakal Dul HE Project, CVPPL, Kishtwar, J&K.
21-Mar-2024 05-Apr-2024
CVPPPL/PDHEP/C&P/NIT-284/2024/966 Dated: 21.03.2024Construction of Shed on Second Floor of Field Hostel at Power House Site of Pakal Dul H.E. Project, CVPPPL, Kishtwar, J&K.
21-Mar-2024 11-Apr-2024
CVPPPL/PDHEP/C&P/NIT-283/2024/964 Date – 21.03.2024Supply, Installation, Testing and Commissioning of Street Lights on 8 meter ST Pole around the Premises of Office cum Field Hostel at DAM Site of Pakal Dul HE Project, CVPPPL, Kishtwar, J&K.
21-Mar-2024 11-Apr-2024
CVPPPL/PDHEP/C&P/NIT-282/2024/937 Date - 13.03.2024Internal Electric Wiring at Administrative Office Complex of Pakal Dul HE Project, CVPPPL, Kishtwar, J&K.
13-Mar-2024 03-Apr-2024
GEM/2024/B/4759211Development of 03 nos Hydrographic and Topographic Sections along the two nos EWS site locations as well as GD Site at Dam Site of Pakal Dul HE Project
15-Mar-2024 25-Mar-2024निविदाएं बंद
GEM/2024/B/4659338Purchase of 13 Nos. Scanners for Pakal Dul HE Project, Kishtwar.
07-Mar-2024 28-Mar-2024निविदाएं बंद
GEM/2024/B/4500102Purchase of Toner /Drum Cartridges of Printers & Multi-function heavy-duty printers installed at Pakal Dul HE Project Kishtwar.
07-Mar-2024 28-Mar-2024निविदाएं बंद
GEM/2024/B/4653653Purchase of 14 nos. All-in –One PCs along with 14 Nos. UPS for Pakal Dul HE Project, Kishtwar.

I
Bid has been extended up to 05.04.2024.  NEW
05-Mar-2024 26-Mar-2024निविदाएं बंद
GEM/2024/B/4683921Purchase of furniture for ED Office and HOP Residence office of Pakal Dul HE project Kishtwar.

I
Bid has been extended up to 05.04.2024.  NEW
05-Mar-2024 26-Mar-2024निविदाएं बंद
GEM/2024/B/4506533Purchase of LED TV for conference hall of office complex of Dam Site, Drangdhuran
27-Feb-2024 19-Mar-2024निविदाएं बंद
GEM/2024/B/4507868Purchase of Sound System for conference hall of office complex of Dam Site, Drangdhuran.

I
Bid has been extended up to 29.03.2024  NEW
27-Feb-2024 19-Mar-2024निविदाएं बंद
GEM/2023/B/4370188Annual Maintenance Contract (AMC) of computers, printers, UPS and peripherals installed at Pakal Dul HE Project for the period of one year.
16-Feb-2024 08-Mar-2024निविदाएं बंद
GEM/2024/B/4586980“Upkeeping of Site office & Field Hostel at Power House Dool of Pakal Dul HE projects”.
15-Feb-2024 01-Mar-2024निविदाएं बंद
GEM/2024/B/4479913Purchase for establishing Laboratory at Dam site office for silt analysis of water sample of Marusudar River.

I
GeM Bid Extended up to 12.03.2024
Corrigendum02
Bid submission date extension  NEW
10-Feb-2024 02-Mar-2024निविदाएं बंद
GEM/2024/B/4547225Purchase of Keyboard and Mouse Combo Kits for Computers at Pakal Dul HE Project.

I
GeM Bid has been extended up to 09.03.2024.
Corrigendum02
Corrigendum of Bid submission date and time
III
Bid has been extended up to 26.03.2024  NEW
07-Feb-2024 28-Feb-2024निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-281/2024/789 Date -06.02.2024Shifting of Portion of 33 KV Dul-I and Dul-II lines falling near the Premises of Ghumai Nag Temple at Dul Village.
06-Feb-2024 27-Feb-2024निविदाएं बंद
GEM/2024/B/4486050Procurement of Electrical Items for R&M of office buildings & residential quarters Pakal Dul HE Project, Kishtwar, J&K.
05-Feb-2024 26-Feb-2024निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-280/2024/751 Date-17.01.2024Electrification of Proposed Drivers Room at Field Hostel and Gazebo at Field Hostel and D-5 Quarter of Pakal Dul H.E. Project, CVPPPL, Kishtwar, J&K.
17-Jan-2024 07-Feb-2024निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-279/2024/745 Date – 15.01.2024Internal Electrical Wiring of Proposed Rest Room at Power House of Pakal Dul H.E. Project, CVPPPL, Kishtwar, J&K.
15-Jan-2024 05-Feb-2024निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-278/2024/743 Dated: 13.01.2024Construction of Two Nos Driver Rooms and Two Nos Gazebo at Field Hostel, Pakal Dul HE Project, CVPPPL, Kishtwar, J&K.
13-Jan-2024 03-Feb-2024निविदाएं बंद
GEM/2023/B/4367451Surveillance, upkeeping and watch & ward of integrated G&D and EWS Stations at two locations of Pakal Dul HE Project.
10-Jan-2024 31-Jan-2024निविदाएं बंद
GEM/2024/B/4422833Purchase of Conference Table & Revolving Chairs for Pakal Dul HE Project, Kishtwar.
09-Jan-2024 30-Jan-2024निविदाएं बंद
GEM/2023/B/4388753Providing services of Technical Assistant, Attendant & Peon/helpers in the
office related works of Pakal Dul HE Project Kishtwar for the period of one
year
08-Jan-2024 29-Jan-2024निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-277/2024/721 Dated: 06.01.2024Extension of Dining Hall, Roofing over Approach Stairs, Wood Plank Lining in the Field Hostel Room and Construction of Dustbin at Field Hostel of Pakal Dul HE Project, CVPPPL, Kishtwar, J&K.
06-Jan-2024 27-Jan-2024निविदाएं बंद
GEM/2023/B/4364715R&M of site office and Field Hostel at Dam Site of Pakal Dul HE Project, Kishtwar.
05-Jan-2024 27-Jan-2024निविदाएं बंद
GEM/2023/B/4061077Purchase of furniture for the new proposed hall and Room no. 5,6,7,9 and 10 of field hostel of Pakal Dul HE Project, Kishtwar.
17-Nov-2023 08-Dec-2023निविदाएं बंद
GEM/2023/B/4361269Annual Maintenance Contract (AMC) of Five (05) Nos. Paper Copier/Heavy Duty Printers installed at various locations of PDHEP, Kishtwar.
01-Jan-2024 22-Jan-2024निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT- 275/2023/695 Dated: 28.12.2023Laying on New Sewage Line, Construction of Septic Tank, Soak Pit, Extension and Renovation of Two Washrooms and Construction of allied structures like manholes at Office Complex of Pakal Dul HE Project, CVPPPL, Kishtwar, J&K.
29-Dec-2023 18-Jan-2024निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-276/2023/696 Date: 28.12.2023Fabrication of Model Part & Installation of the modified design of Alternative-III for 1:25 Scale 3-D Comprehensive Model of Single Tunnel Spillway of Pakal Dul HE project, J&K at CWPRS, Pune.
28-Dec-2023 04-Jan-2024निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-274/2023/688 Date: 23.12.2023Hiring of 06 Nos. of Mahindra Bolero B6 (O) for a period of 2 years for Pakal Dul HE Project, Kishtwar, J&K.

Corrigendum01
Extension of Bid Submission Date and Tender Opening Date
Corrigendum02
Extension of Bid Submission Date and Tender Opening Date  NEW
23-Dec-2023 15-Jan-2024निविदाएं बंद
Bid No - GEM/2023/B/4349541 Dated - 21.12.2023Providing services of Technical Assistant, Attendant, Peon/Helpers in the office related works of Pakal Dul HE Project, Kishtwar for the period of One Year.

Corrigendum - Cancellation of GeM Bid
Cancellation of GeM Bid due to Technical Reason  NEW
21-Dec-2023 11-Jan-2024निविदाएं बंद
GEM/2023/B/4308788Annual Maintenance Contract (AMC) of 3 no. Ashok Leyland make DG sets installed at different locations of PDHEP, Kishtwar.

Corrigendum No-I CVPP/PDHEP/C&P/2024/85
Corrigendum No. II CVPP/PDHEP/C&P/2024/738
Corrigendum No. III CVPP/PDHEP/C&P/2023/754  NEW
12-Dec-2023 02-Jan-2024निविदाएं बंद
GEM/2023/B/4306597Annual Maintenance Contract (AMC) of 6 no. Sudhir make DG sets installed at different locations of PDHEP

Corrigendum-I CVPP/PDHEP/C&P/2023/705  NEW
09-Dec-2023 30-Dec-2023निविदाएं बंद
GEM/2023/B/4276235Purchase of Engineering Software AutoCAD Licenses for Pakal Dul HE Project Kishtwar – on annual subscription basis.

Corrigendum-I CVPP/PDHEP/C&P/2023/706
Corrigendum No. II CVPP/PDHEP/C&P/2023/728
Corrigendum No. III CVPP/PDHEP/C&P/2023/747
Corrigendum CVPP/PDHEP/C&P/2024/785
Cancellation of GeM Bid.  NEW
08-Dec-2023 29-Dec-2023निविदाएं बंद
GEM/2023/B/4075246 Dated 28-11-2023Hiring of manpower at Dam Site office, Pakal Dul HEP for collection of Gauge & Discharge data & water samples of Marusudar river for silt analysis
28-Nov-2023 19-Dec-2023निविदाएं बंद
GEM/2023/B/4071450 Dated 22-11-2023Providing services for R&M of Hired Guest House/Transit Camp (work includes R&M of mess, Cleaning and Sweeping of building premises, Watch & Ward services) for Pakal Dul HE Project CVPPPL, Kishtwar, J&K for the period of one year

CVPP/PDHEP/CnP/2023/641 Dated 23.11.2023
Corrigendum 1
Corrigendum02
Providing services for R&M of Hired Guest House/Transit Camp (work includes R&M of mess, Cleaning and Sweeping of building premises, Watch & Ward services) for Pakal Dul HE Project CVPPPL, Kishtwar, J&K for the period of one year  NEW
22-Nov-2023 13-Dec-2023निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT- 272/2023/37 Date: 04.11.2023Supply of water through water tanker (approx. 8000 Litre) at Residential Colony, DPS Colony of Pakal Dul HE Project, CVPPL, Kishtwar, J&K.

Corrigendum01
Last date of Bid submission has been revised to 09.12.2023 upto 6.00PM(online) and 11.12.2023 upto 12.30PM(Offline) and tender will be opened at 11.12.2023 at 4.00PM
Corrigendum No. II CVPP/PDHEP/C&P/2023/655
Last date of Bid submission has been revised to 21.12.2023 up to 6:00PM(online) and 23.12.2023 up to 12:30PM(Offline) and tender will be opened at 23.12.2023 at 4:00PM
Corrigendum - Cancellation of Tendering Process
Cancellation of Tendering Process due to Technical Upload  NEW
04-Nov-2023 27-Nov-2023निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-273/2023/42 Dated: 07.11.2023Hiring of 01 No. Extra Long Pickup for a period of 2 years for Pakal Dul HE Project, Kishtwar, J&K.
07-Nov-2023 28-Nov-2023निविदाएं बंद
GEM/2023/B/4118607 Dated 10.11.2023Purchase of 02 Nos. of Ambulance BSVI Type-B for Pakal Dul HE Project under Environmental Management Plan, Kishtwar

CVPP/PDHEP/C&P/2023/650
Corrigendum-I. Bid opening date extended to 11.12.2023
Corrigendum No. II CVPP/PDHEP/C&P/2023/656
The Subject GeM Bid is hereby extended up to 18.12.2023
Corrigendum No. III CVPP/PDHEP/C&P/2023/672
The Subject GeM Bid is hereby extended up to 25.12.2023  NEW
10-Nov-2023 01-Dec-2023निविदाएं बंद
GEM/2023/B/4062702 Dated 09.11.2023Purchase of Water Purifier for the residential colony of PDHEP, Kishtwar
09-Nov-2023 30-Nov-2023निविदाएं बंद
GEM/2023/B/4115211 Dated: - 08-11-2023Supply, Installation, Testing and Commissioning of STP at Powerhouse (Dool) and Dam Site (Dranduran) of Pakal Dul HE Project, CVPPPL, Kishtwar, J&K.
08-Nov-2023 29-Nov-2023निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT- 271/2023/573 Date: 11.10.2023Construction of Rest Room for Drivers and R&M Mess Staff at Power House Site of Pakal Dul HE Project, CVPPL, Kishtwar, J&K.

Corrigendum # 01
Corrigendum for Definition of Similar Nature of Work and Extension of Bid Submission Date  NEW
11-Oct-2023 01-Nov-2023निविदाएं बंद
GEM/2023/B/3982105 Dated:- 08-10-2023Purchase of LED TV for employees shifted from Hotel Hayat to A-Type & C0 quarters and Field Hostel at Dam and Power House Site of Pakal Dul HE Project, Kishtwar.

CVPP/PDHEP/C&P/2024/765
Cancellation of the bid due to technical reason.  NEW
18-Oct-2023 08-Nov-2023निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-270/2023/527/Dated: 26.09.2023Extension of existing conference hall & wood plank ceiling, flooring and wall lining in administrative building of Pakal Dul HE Project, J&K.
26-Sep-2023 17-Oct-2023निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-269/2023/515/Date-16.09.2023Repair/Renovation of quarters hired by PDHEP from DPS i.e. Villas, A-Type, B-Type etc. at DBS and Semna Colony, Kishtwar, J&K of Pakal Dul HE Project, CVPPPL, J&K.

Corrigendum01
Amendments in Tender Fee and EMD Fee Mentioned in Tender Detail Sheet of NIT due to Typographical Error.  NEW
16-Sep-2023 09-Oct-2023निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-267/2023/470, Date: 17.08.2023Construction of Railing over existing Retaining Wall in front of DAM Site Office (Drangdhuran) of Pakal Dul HE Project, Kishtwar, J&K
18-Aug-2023 08-Sep-2023निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-268/2023/468 Dated: 17.08 .2023Construction of Dispensary along with water supply system and septic tank for dispensary of field hostel building at Power House site of Pakal Dul HE Project, J&K.
17-Aug-2023 07-Sep-2023निविदाएं बंद
GEM/2023/B/3746261 Dated:- 12-08-2023Procurement of Electrical Items for R&M of office buildings & residential quarters Pakal Dul HE Project, Kishtwar, J&K

Corrigendum - Cancellation of GeM Bid
Procurement of Electrical Items for R&M of Office Building & Residential Quarters of Pakal Dul HE Project, Kishtwar, J&K  NEW
12-Aug-2023 02-Sep-2023निविदाएं बंद
GEM/2023/B/3718562 Dated:- 05-08-2023Purchase of 02 Nos. of Ambulance BSVI Type-B for Pakal Dul HE Project under Environmental Management Plan, Kishtwar.

Corrigendum - Cancellation of GeM Bid  NEW
05-Aug-2023 26-Aug-2023निविदाएं बंद
GEM/2023/B/3685897 Dated: - 31.07.2023Annual Maintenance Contract (AMC) of Five (05) Nos. Paper Copier/Heavy Duty Printers installed at various locations of PDHEP, CVPPPL, Kishtwar, J&K

Corrigendum Bid Cancellation
Cancellation of GeM Bid due to Technical Reason  NEW
31-Jul-2023 16-Aug-2023निविदाएं बंद
Bid No - GEM/2023/B/3688581 Dated - 28.07.2023Purchase of 05 No. biometric e-attendance machines for PDHEP, Kishtwar
28-Jul-2023 12-Aug-2023निविदाएं बंद
Bid No - GEM/2023/B/3608948 Dated - 11.07.2023Purchase of furniture for equipping Dam site office , Drangdhuran, Kishtwar
11-Jul-2023 26-Jul-2023निविदाएं बंद
Bid No - GEM/2023/B/3344620 Dated - 03.06.2023Purchase of Personal Protective Equipment (PPE) for Pakal Dul HE Project, Kishtwar

Corrigendum - Cancellation of GeM Bid  NEW
03-Jun-2023 24-Jun-2023निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-266/2023/288 Date: 23.06.2023Development of area in front of the Site Office at Dam Site of Pakal Dul HE Project, Kishtwar, J&K
23-Jun-2023 14-Jul-2023निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-265/2023/287 Date: 20.06.2023Construction of Drain near Helipad/Ground of Sounder Village Acess Road on the Upstream of DAM Site of Pakal Dul HE Project, Kishtwar, J&K

corrigendum 01 - extension of bid submission dates
extension of bid submission dates  NEW
20-Jun-2023 11-Jul-2023निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-264/2023/274 Date: 15.06.2023Providing Plywood Partition in Rooms of Field Hostel at Dam Site of PDHEP, Kishtwar, J&K
15-Jun-2023 06-Jul-2023निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-263/2023/267 Date – 13.06.2023Construction of Main Entry Gate, Security Hut and PCC Drain Near Site Office (Drangdhuran) at Pakal Dul HEP, KIshtwar, J&K.
13-Jun-2023 04-Jul-2023निविदाएं बंद
Bid No - GEM/2023/B/3399146 Dated - 09.06.2023Purchase of Cartridges/Drums of Printers & Photocopiers at Pakal Dul HE Project, Kishtwar, J&K
12-Jun-2023 27-Jun-2023निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-262/2023/266/Date – 10.06.2023Internal Electric Wiring of 6no. Washrooms (Room-3 to Room-8) and 2 no. Pantry (Room-3&4) at Field Hostel of Pakal Dul HE Project, Kishtwar, J&K.

Extension of Bid submission Date  NEW
10-Jun-2023 01-Jul-2023निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-261/2023/231/Date - 15.05.2023Hiring of 04 Nos. of Mahindra Bolero B6 (O) for a period of 2 years for Pakal Dul HE Project, Kishtwar, J&K.
15-May-2023 07-Jun-2023निविदाएं बंद
Bid No - GEM/2023/B/3454123 Dated - 31.05.2023Supply, Installation, Testing and Commissioning of STP at Power House and Dam Site of Pakal Dul HE Project, CVPPPL, Kishtwar J&K.

Corrigendum - Cancellation of GeM Bid  NEW
31-May-2023 21-Jun-2023निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-260/2023/228 Dated: 13.05.2023Hiring of 06 Nos. of Mahindra Bolero B6 (O) for a period of 2 years for Pakal Dul HE Project, Kishtwar, J&K
13-May-2023 03-Jun-2023निविदाएं बंद
Bid No - GEM/2023/B/3355741 Dated - 09.05.2023Procurement of Stationery items for office use of Pakal Dul HE Project, CVPPPL, J&K.

CVPP/PDHEP/C&P/2023/422  NEW
09-May-2023 30-May-2023निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-259/2023/220 Dated: 08.05.2023Repair/Renovation of Washroom of Field Hostel for Room No. 3 to 8 of Pakal Dul HE Project, Kishtwar, J&K
08-May-2023 29-May-2023निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT–258/2023/219 Date: 08.05.2023Repair and Painting of Office Complex (Block 1 & 2) of Pakal Dul HE Project, Kishtwar, J&K.
08-May-2023 29-May-2023निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-257/2023/199 Dated: 02.05.2023Construction of Catch Water Drain in Village Drangdhuran Upstream of Power Intake and Surface Spillway Area at PDHEP, CVPPPL, KIshtwar, J&K.

Corrigendum01
Experience Criteria for Qualification of the Bidder.  NEW
02-May-2023 23-May-2023निविदाएं बंद
GEM/2022/B/2907676/Dated - 31.12.2022Purchase of Furniture, Furnishing Items for the Quarters of Pakal Dul HE Project, Kishtwar, J&K
31-Dec-2022 10-Jan-2023निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-256/2023/79 Date: 03.02.2023Aluminium works in front portion of Field Hostel Rooms 1 to 10 and construction of Pantry for Room 3&4 of Pakal Dul HE Project, CVPPPL, Kishtwar, J&K.
03-Feb-2023 24-Feb-2023निविदाएं बंद
GEM/2023/B/33043765/Dated : 02.02.2023Purchase of Furniture for Conference Room established at Dam Site, Drangdhuran of PDHEP, CVPPPL, Kishtwar, J&K.

Corrigendum - Cancellation of GeM Bid
Corrigendum - Cancellation of GeM Bid  NEW
02-Feb-2023 17-Feb-2023निविदाएं बंद
GEM/2023/B/3032190/Dated : 02.02.2023Purchase of Furniture and Furnishing Items for DAM Site Field Hostel, Drangdhuran at PDHEP, CVPPPL, Kishtwar.

Corrigendum - Cancellation of GeM Bid
Corrigendum - Cancellation of GeM Bid
Corrigendum - Cancellation of GeM Bid
Corrigendum - Cancellation of GeM Bid  NEW
02-Feb-2023 17-Feb-2023निविदाएं बंद
GEM/2023/B/2993136/Dated : 24.01.2023Purchase of Survey Equipment “3D Scanning Station enabled with Tunnel Eight and “Differential Global Positioning System” for Pakal Dul HE Project

Cancellation of Tender  NEW
24-Jan-2023 14-Feb-2023निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-255/2023/71 Date: 28.01.2023Construction of Store Rooms and Common Washroom facility near Field Hostel Dangduran, Kishtwar, J&K.

CVPPPL/PDHEP/C&P/2023/394/Date - 28.07.2023
Cancellation of Tendering Process due to Administrative Reason  NEW
28-Jan-2023 18-Feb-2023निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-254/2023/18Work of Surveillance, Up Keeping and Watch & Ward of Integrated G&D and EWS Stations for PDHEP, Kishtwar, J&K
19-Jan-2023 03-Feb-2023निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-252/2022/869 Dated 28.12.2022Renovation/Repair of Washrooms of Field Hostel for PDHEP Kishtwar, J&K
29-Dec-2022 13-Jan-2023निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-253/2022/872 Date - 30.12.2022Repair/Renovation of Toilets of School in Dranduran Area for implementation of CSR Activity for F.Y. 2021-22 at Pakal Dul HEP, Kishtwar, J&K.
30-Dec-2022 20-Jan-2023निविदाएं बंद
GEM/2022/B/2882992 dated 23.12.2022Supply, installation, testing & commissioning of surveillance system at vital construction sites and offices of PDHEP
23-Dec-2022 13-Jan-2023निविदाएं बंद
GEM/2022/B/2869238 Dated 23.12.2022Supply, installation, testing & commissioning of backbone LAN network including access points and Power backup at vital construction sites and offices of PDHEP
23-Dec-2022 08-Jan-2023निविदाएं बंद
GEM/2022/B/2841488 Dated 17.12.2022purchase of furniture and furnishing items for 10 rooms of newly constructed Field Hostel & Office Complex at power house site Dool, Pakal Dul HEP, Kishtwar
17-Dec-2022 05-Jan-2023निविदाएं बंद
GEM/2022/B/2862464 Dated 17.12.2022Purchase of oil filled radiator heaters for different locations of Pakal Dul HE Project
17-Dec-2022 28-Dec-2022निविदाएं बंद
GEM/2022/B/2859835 Dated 19.12.2022Purchase of M S office licenses for PCs/laptops installed at Pakal Dul HE Project

Cancellation of Tender  NEW
19-Dec-2022 09-Jan-2023निविदाएं बंद
GEM/2022/B/2862961 dated 20.12.2022Purchase of Cartriges/Drums for Printer & Photocopier for Pakal Dul HE Project kishtwar

Cancellation of Tender  NEW
20-Dec-2022 04-Jan-2023निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-248/2022/801 Dated30.11.2022Internal Electrical wiring of 4 no of washrooms at field hostel,4 no C-1 quarters (I1, I2, L3 & N3) of Pakal Dul H.E. Project (CVPPL), Kishtwar, J&K
01-Dec-2022 16-Dec-2022निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-249/2022/802 Dated 01.12.2022Renovation/Repair of Washrooms of Field Hostel for PDHEP Kishtwar, J&K

Cancellation of Tender  NEW
02-Dec-2022 17-Dec-2022निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-251/2022/838 Dated - 21.12.2022Construction of R/Walls in Front of Site Office at Dam Site Office of PDHEP, Kishtwar, J&K.

Corrigendum02
Revised Similar Nature of Work  NEW
21-Dec-2022 11-Jan-2023निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-250/2022/837 Dated - 21.12.2022Providing Plywood Partition in Rooms of Field Hostel at Dam Site of PDHEP, Kishtwar, J&K.

Corrigendum02
Revised Similar Nature of Work
Corrigendum03
Extension of Bid Submission Date
Cancellation of Tender
cancellation of tender  NEW
21-Dec-2022 11-Jan-2023निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-247/2022/784 Dated-21.11.2022Fencing of Acquired Land near Drangdhuran Area by Way of Barbed Wire with Concertina Coil,
at Pakal Dul HE Project, Kishtwar, J&K
22-Nov-2022 14-Dec-2022निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-246/2022/783 Dated-21.11.2022Repair/Renovation of Toilets of Schools in Dool Area for Implementation of CSR Activity for F.Y. 2021-22 at PDHEP, Kishtwar, J&K
22-Nov-2022 13-Dec-2022निविदाएं बंद
CVPPPL/PDHEP/CnP/NIT-245/2022/782/Date 21.11.22Construction of Store Rooms and Common Washroom facility near Field Hostel Dangduran, Kishtwar, J&K

Corrigendum01
Extension of Bid Submission Date
Corrigendum#Cancellation of Tendering Process
Cancellation of Tender  NEW
21-Nov-2022 12-Dec-2022निविदाएं बंद
CVPPPL/PDHEP/CnP/NIT -244/2022/770 Dated 15/11/2022Hiring of 02 No. of Force Traveller BSVI for a period of 2 years for Pakal Dul HE Project

Corrigendum No1
Corrigendum No 2  NEW
16-Nov-2022 07-Dec-2022निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-243/2022/769Up keeping of site office & field hostel at Power House Dool of Pakal Dul HE Project of One Year
16-Nov-2022 07-Dec-2022निविदाएं बंद
CVPPPL/PDHEP/NIT-242/2022/768R&M of Site Office, Field Hostel and Transit Camp (Ikhala) at DAM Site of Pakal Dul HEP, Kishtwar, J&K for one Year.
15-Nov-2022 06-Dec-2022निविदाएं बंद
CVPPPL/PDHEP/NIT-238/2022/741Renovation/Repair of 8 nos. C-1 Type Quarters and Other Miscellaneous Works in Colony for Pakal Dul H.E. Project (CVPPL), Kishtwar, J&K
11-Nov-2022 26-Nov-2022निविदाएं बंद
CVPPPL/PDHEP/NIT-240/2022/743Work of surveillance, up keeping and watch and ward of integrated G&D and EWS Stations for PDHEP, Kishtwar, J&K.

Cancellation of Tender  NEW
26-Nov-2022 23-Nov-2022निविदाएं बंद
CVPPPL/PDHEP/CnP/NIT-241/2022/ 744 Dated: 28.10.2022Annual Maintenance Contract (AMC) of Computers, Printers & UPS installed in PDHEP, Kishtwar for one year
21-Nov-2022 19-Nov-2022निविदाएं बंद
CVPPPL/PDHEP/NIT-234/2022/733Hiring of 01 No. Force Traveller Ambulance (Type C) or higher model for a period of 2 years for Pakal Dul HE Project, Kishtwar.

Cancellation of Tender
Cancellation of Tender  NEW
19-Oct-2022 10-Nov-2022निविदाएं बंद
CVPPPL/PDHEP/NIT-233/2022/732Hiring of 02 No. New Mahindra Bolero B6 (O) for a period of 2 years for Pakal Dul HE Project
19-Oct-2022 10-Nov-2022निविदाएं बंद
CVPPPL/PDHEP/NIT-235/2022/735Providing services of technical assistant and peon/ helpers in the office related works of Pakal Dul HE Project, for a period of one year.
19-Oct-2022 01-Nov-2022निविदाएं बंद
CVPPPL/PDHEP/NIT-236/2022/736/Dated 18.10.2022R&M of D-5 Quarter, Field Hostel, A&B Type Quarter, Bachelor Accommodation and pantry in office building incl. sweeping & cleaning of inside and outside area, bathroom, open area, roads, office building, up keeping of lawns & garden, operation & maintenance of sanitary fittings, water supply, electrical fitting, DG sets and supervision of all manpower for Pakal Dul HE Project for the period of one year.
18-Oct-2022 01-Nov-2022निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-229/2022/559Providing services of technical assistant and peon/helpers in the office related works of Pakal Dul HE Project, Kishtwar for the period of one year

Corrigendum 1
Corrigendum#Cancellation of Tendering Process
Providing services of Technical Assistant and Peon/Helpers in the office related works of Pakal Dul HE Project, Kishtwar” for the period of one year  NEW
25-Jul-2022 16-Aug-2022निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-225/2022/485Providing Services for R&M of Bachelor Accommodation/Field hostel at Hotel Hayat, Malipath Kishtwar (work includes R&M of mess, Cleaning and Sweeping of building premises, Watch & Ward services) for Pakal Dul H.E Project, CVPPPL, Kishtwar, J&K for the period of one year.

Corrigendum 1  NEW
09-Jul-2022 30-Jul-2022निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-224/2022/458Purchase of M S Office Standard 2021 software for Pakal Dul HE Project, Kishtwar

Corrigendum 1
Corrigendum 2
Cancellation of Tender  NEW
25-Jun-2022 26-Aug-2022निविदाएं बंद
GEM/2022/B/2226579Published bid document (Gem Portal) in respect of - "Supply, Installation, Testing and Commissioning of CCTV Cameras at vital locations of Pakal Dul HEP"

Cancellation Notice  NEW
01-Jun-2022 16-Jun-2022निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-222/2022/392Hiring of 02 No. New Force Traveller for a period of 2 years for Pakal Dul HE Project, Kishtwar

Cancellation Notice  NEW
27-May-2022 25-Jun-2022निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-220/2022/384Hiring of 04 No. New Mahindra Scorpio S9 140 BS-VI for a period of 2 years for Pakal Dul HE Project

Corrigendum 1
Corrigendum 2  NEW
26-May-2022 20-Jul-2022निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-221/2022/391Hiring of 04 No. New Mahindra Bolero B6(O) for a period of 2 years for Pakal Dul HE Project, Kishtwar

Corrigendum 1  NEW
26-May-2022 11-Jul-2022निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-223/2022/393Hiring of 02 No. Mahindra Bolero Camper for a period of 2 years for Pakal Dul HE Project, Kishtwar

Corrigendum 1  NEW
27-May-2022 13-Jul-2022निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-219/2022/321Repair/Renovation of toilets for implementation of CSR Activities for Pakal Dul HE Project, CVPPPL, Kishtwar, J&K

Corrigendum 1
Corrigendum 2
Corrigendum 3  NEW
18-May-2022 12-Jul-2022निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-218/2022/316Fabrication and Installation of Tunnel Spillway (02 tunnels) including energy dissipators for 1:70 scale 3D spillway model for Pakal Dul HE Project, Kishtwar, J&K

Corrigendum-1
Corrigendum 2  NEW
07-May-2022 04-Jun-2022निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-217/2022/257Supply, Erection, Testing and Commissioning of 250 KVA, 11/0.433 KV distribution substation at Drangdhuran Dam site of Pakal Dul HE Project, CVPPPL, Kishtwar, J&K

Corrigendum 1
Corrigendum 2
Corrigendum 3
Corrigendum 4  NEW
20-Apr-2022 20-Jun-2022निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-216/2022/206Maintenance of road from Tamruchi to TBM adit at Power House site of Pakal Dul HE Project, CVPPPL, Kishtwar, J&K

Corrigendum 1
Corrigendum#Cancellation of Tendering Process
Maintenance of Road from Tamruchi to TBM Adit at Power House Site of Pakal Dul HE Project CVPPPL, Kishtwar J&K.  NEW
24-Mar-2022 21-Apr-2022निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-212/2022/181Supply, Installation, Testing and Commissioning of 125 KVA DG Set at Drangdhuran (Dam Site), 125 KVA DG set at CO quarters, 62.5 KVA DG Set at A-type quarters and supply of 03 nos. portable DG sets for Pakal Dul HE Project

Corrigendum 1  NEW
08-Mar-2022 09-Apr-2022निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-213/2022/198Purchase & installion of Audio video system for conference room of Pakal Dul HE Project, CVPPPL, Kishtwar, J&K

Cancellation Notice  NEW
19-Mar-2022 08-Apr-2022निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-210/2022/93Construction of Retaining wall & Boundary wall at Power House site of Pakal Dul HE Project, CVPPPL, Kishtwar. J&K

Corrigendum 1
Corrigendum 2
Corrigendum 3  NEW
08-Feb-2022 24-Mar-2022निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-209/2022/59Internal Electrical wiring of 14 No. CO Quarters (G&H block) of Pakal Dul HE Project, CVPPPL, Kishtwar, J&K

Corrigendum 1  NEW
31-Jan-2022 05-Mar-2022निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-207/2021/893Supply & Installation of Integrated G&D (Automatic velocity meter) and flood EWS (Early Warning System) at two sites of Pakal Dul HE Project, CVPPPL, Kishtwar, J&K

Corrigendum 1
Corrigendum 2  NEW
24-Dec-2021 20-Jan-2022निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-204/2021/844Hiring of 07 Nos. New Mahindra Bolero B6(optional) BS-VI for two years period by Pakal Dul HE Project, Kishtwar

Cancellation Notice  NEW
14-Dec-2021 03-Jan-2022निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-205/2021/845Supply of water through water tanker (8000 Litre capacity) for Hotel Hayat (Malipath) & Mess running in Semna Colony for Pakal Dul HE Project, CVPPPL, Kishtwar for a period of one year

Corrigendum 1  NEW
15-Dec-2021 18-Jan-2022निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-206/2021/846Hiring of One Number New Mahindra Scorpio S7 140 BS-VI vehicle for Pakal Dul HE Project, Kishtwar for two years period

Corrigendum 1
Corrigendum 2  NEW
15-Dec-2021 27-Jan-2022निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-203/2021/843Repair & Renovation of D5 Villa & Field Hostel/Officers Transit Camp for the use of Pakal Dul HE Project, CVPPPL, Kishtwar J&K
14-Dec-2021 04-Jan-2022निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-201/2021/740Supply, Erection, Testing & Commissioning of 250KVA, 11/0.433 KV distribution substation at Drangdhuran Dam site of Pakal Dul HE Project, Kishtwar, J&K

Cancellation Notice  NEW
12-Nov-2021 03-Dec-2021निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-199/2021/702Providing and installation of water supply & sewage system for Field Hostel at Power House site of Pakal Dul HE Project, CVPPPL, Kishtwar, J&K

Corrigendum 1
Cancellation Notice  NEW
02-Nov-2021 02-Dec-2021निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-198/2021/693Purchase of Air Conditioner for Field Hostel and D-5 quarter of Pakal Dul HE Project, CVPPPL, Kishtwar, J&K
18-Oct-2021 11-Nov-2021निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-197/2021/656Repair of 17 nos. CO type qtrs. Qtr. no. A-81, A-35, C-1-N-5 & VILLA 31B QTRS. & External repair in D,E,F,G (C-O type) block for the use of Pakal Dul HE Project,CVPPPL, Kishtwar, J&K
07-Oct-2021 27-Oct-2021निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-196/2021/640Purchase of Desktop computers, UPS and MFP printers for Pakal Dul HE Project, CVPPPL, Kishtwar,J&K

Corrigendum 1
Corrigendum 2  NEW
28-Sep-2021 15-Nov-2021निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-195/2021/594Upkeeping of site office at PH (Power House) site of Pakal Dul HE Project for one year period, Kishtwar,J&K
14-Sep-2021 04-Oct-2021निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-194/2021/593Construction of marking pillars (Burji) along the bank reservoir bank and boundary of land acquired at Dam site of Pakal Dul HE Project, CVPPPL, Kishtwar, J&K
14-Sep-2021 04-Oct-2021निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-191/2021/526R&M of D-5 quarter, field hostel, A&B type quarters, bachelor accomodation and pantry in office building including sweeping & cleaning of inside and outside area, bathrooms, open area, roads, office building, upkeeping of lawns & garden, operation & maintenance of sanitary fittings, water supply, electrical fitting, DG Sets and Supervision of all manpower for Pakal Dul HE Project, Kishtwar, for one year period
20-Aug-2021 11-Sep-2021निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-192/2021/527Upkeeping including (i.e Cleaning, Sweeping, watch & ward) of Ikhala camp/ Drangdhuran at Dam Site of Pakal Dul HE Project for the period of one year
20-Aug-2021 13-Sep-2021निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-189/2021/480Providing services for R&M of bachelor Accomodation/ Field Hostel at Hotel Hayat, Malipeth kishtwar (work includes R&M of mess, cleaning and sweeping of building premises, watch & ward services) for Pakal Dul HE Project, CVPPPL, Kishtwar for the period of 1 year.
04-Aug-2021 31-Aug-2021निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-188/2021/467Providing services of technical assistant and peon/helpers in the office works of Pakal Dul HE Project for one year period

Corrigendum 1  NEW
31-Jul-2021 23-Aug-2021निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-186/2021/462Hiring of 13 Nos. New Mahindra Bolero B6 (optional) BS-VI for two years period by Pakal Dul HE Project, Kishtwar
28-Jul-2021 25-Aug-2021निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-187/2021/463Hiring of 02 Nos. New Mahindra Scorpio S7 BS-VI for two years period by Pakal Dul HE Project, Kishtwar
28-Jul-2021 25-Aug-2021निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-183/2021/444Providing services for R&M of Bachelor Accomodation/ Field hostel at Hotel Hayat, Malipeth Kishtwar ( work includes R&M of mess, cleaning and sweeping of building premises, watch & ward services) for Pakal Dul HE Project, CVPPPL, Kishtwar for the period of 1 year

Cancellation Notice  NEW
21-Jul-2021 18-Aug-2021निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-182/2021/431Purchase of stationary items for administrative office & site offices for Pakal Dul HE Project, CVPPPL, Kishtwar, J&K

Corrigendum 1  NEW
14-Jul-2021 14-Aug-2021निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-181/2021/392Internal Electrical Wiring of proposed Conference Hall of Pakal Dul HE Project, CVPPPL, Kishtwar, J&K

Cancellation Notice  NEW
24-Jun-2021 21-Jul-2021निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-178/2021/343Hiring of 13 Nos. New Mahindra Bolero B6 (Optional) BS-VI for two years period by Pakal Dul HE Project, Kishtwar

Cancellation Notice  NEW
02-Jun-2021 30-Jun-2021निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-179/2021/344Hiring of 02 Nos. New Mahindra Scorpio S7 BS-VI for two years period by Pakal Dul HE Project, Kishtwar

Cancellation Notice  NEW
02-Jun-2021 30-Jun-2021निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-176/2021/331Construction of 02 Nos. Temporary Office sheds at Dam Site of Pakal Dul HE Project, Kishtwar

Corrigendum 1
Corrigendum 2
Cancellation Notice  NEW
18-May-2021 28-Jun-2021निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-174/2021/261Construction of Conference Hall, 3 Rooms, Washroom and Open Shed near Administrative Building-1 of Pakal Dul HE Project, Kishtwar

Corrigendum 1
Corrigendum 2
Corrigendum 3
Cancellation Notice  NEW
12-Apr-2021 28-May-2021निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-175/2021/281Geological Exploration by excavation & drilling of 440 mtr. long 01 number drift in rectangular cross section of size 1.8 x 2.1 mtr. on left bank of river Chenab at Propsed Power House Site of Kirthai-II Hydroelectric Project, Kishtwar

Corrigendum No. 01  NEW
17-Apr-2021 17-May-2021निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-173/2020/1787Construction of approach to platform for prefab structure at Drangdhuran Dam site of Pakal Dul HE Project.
26-Dec-2020 25-Jan-2021निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-172/2020/1770Purchase of Furniture Items for Govt. Schools in District Kishtwar under CSR and Sustainability activity for FY 2020-21 for Pakal Dul HE Project, CVPPPL, Kishtwar, J&K
18-Dec-2020 07-Jan-2021निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-171/2020/1769Purchase of Medical equipment for District Hospital Kishtwar under CSR and Sustainability activity for FY 2020-21 for Pakal Dul HE Project, CVPPPL, Kishtwar, J&K
18-Dec-2020 07-Jan-2021निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-168/2020/1673Purchase of Furniture Items for Govt. Schools in District kishtwar under CSR and Sustainability activity for FY 2020-21 for Pakal Dul HE Project, CVPPPL, Kishtwar, J&K

Corrigendum 1
Cancellation Notice  NEW
07-Dec-2020 28-Dec-2020निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-167/2020/1672Purchase of Medical Equipment for District Hospital Kishtwar under CSR and Sustainability activity for FY 2020-21 for Pakal Dul HE Project, CVPPPL, Kishtwar, J&K

Corrigendum 1
Cancellation Notice  NEW
07-Dec-2020 28-Dec-2020निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-170/2020/1710Supply, Erection, Testing, Commissioning (SITC) and Transportation of Platform Mounted 250KVA, 11/0.433 KV, 3 phase copper wound oil immersed with OCTC type Distribution substation of Power House site office complex and newly proposed field Hostel at Dul of Pakal Dul HE Project, CVPPPL, Kishtwar, J&K
28-Nov-2020 18-Dec-2020निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-169/2020/1709Annual Maintenance Contract (AMC) of Computer, Printer & UPS of Pakal Dul HE Project for one year

Corrigendum 1
Corrigendum 2  NEW
27-Nov-2020 30-Jan-2021निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-166/2020/1654Construction of Store Room and Development of area around Power House Site Office of Pakal Dul HE Project

Cancellation Notice  NEW
28-Oct-2020 23-Nov-2020निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-165/2020Disposal of Old & Used Vehicles (Maruti gypsy), Equipment (Crawler Dozer, BD-50) and its spare parts of Pakal Dul HE Project, CVPPPL, Kishtwar, J&K

Corrigendum 1
Corrigendum 2  NEW
23-Oct-2020 13-Jan-2021निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-164/2020/1644Collection of Gauge & Discharge data and water samples of Marusudar River at Dam site of Pakal Dul HE Project and silt analysis in sediment laboratory for two year period
20-Oct-2020 20-Nov-2020निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT 163/2020/1532Up-keeping of site office at Power House Site of Pakal Dul HE Project for the period of one year
05-Sep-2020 03-Oct-2020निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-161/2020/1525Internal Electrical Wiring of Field hostel at power house Site of pakal Dul HEproject, CVPPPL, Kishtwar, J&K
04-Sep-2020 05-Oct-2020निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT 162/2020/1526Restoration of Gangaided by-pass road damaged at National Highway and Bhandarkot side Downstream end road junction and construction of Culvert for cross drainage of water falling on road
05-Sep-2020 28-Sep-2020निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-160/2020/1498R&M of Bachelor Accomodation at hotel Hayat Kishtwar, including R&M of mess, cleaning & sweeping of building and watch & ward services for Pakal dul HE Project, CVPPPL, Kishtwar, J&K for one-year period

Corrigendum 1  NEW
29-Aug-2020 14-Sep-2020निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-155/2020/1422R&M of Bachelor Accomodation at hotel hayat Kishtwar, including R&M of mess, cleaning & sweeping of building and watch & ward services for Pakal Dul HE Project, CVPPPL, kishtwar, J&K for one-year period

Corrigendum 1  NEW
31-Jul-2020 29-Aug-2020निविदाएं बंद
CVPP/PDHEP/C&P/NIT-151/2020/1285Purchase of Automatic Reflectorless Electronic Total Station enabled with Tunnel Profiler and Scanning Mode (As per Technical Specifications attached in Annexure-P) for Pakal Dul HE Project, CVPPPL, Kishtwar, J&K

Corrigendum for Retender  NEW
08-Aug-2020 04-Sep-2020निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-158/2020/1444Providing Assistance Services in the office works of Pakal Dul HE Project, CVPPPL, Kishtwar, J&K for One-Year Period

Corrigendum 1  NEW
08-Aug-2020 12-Sep-2020निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-156/2020/1447R&M of D-5 Qtr., field hostel, A&B type Qtrs., bachelor accommodation and pantry in office building including sweeping & cleaning of F H rooms (inside and outside area), Bathrooms, open area, roads, office building, upkeeping of lawns & garden, operation & maintenance of sanitary fittings, water supply, electrical fittings, DG sets and supervision of all manpower for Pakal Dul HE Project, Kishtwar

Corrigendum 1  NEW
08-Aug-2020 15-Sep-2020निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-157/2020/1458Upkeeping including Sweeping, Cleaning, Watch & Ward of Ikhala Camp/Dangdhuran at Dam Site of Pakal Dul HE Project for One Year Period

Corrigendum 1  NEW
10-Aug-2020 10-Sep-2020निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-152/2020/1298Purchase of Furniture and Furnishing items for Bachelor Accommodation at DSB & Semna Colony, Kishtwar for Pakal Dul HE Project, CVPPPL, Kishtwar, J&K
01-Jun-2020 22-Jun-2020निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-153/2020/1315Purchase of Toner/Drum Cartridges for Printers and WorkCenter (As per Technical Specifications attached in Annexure-PC) for Pakal Dul HE Project, CVPPPL, Kishtwar,J&K
10-Jun-2020 01-Jul-2020निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-151/2020/1285Purchase of Automatic Reflectorless Electronic Total Station enabled with Tunnel Profiler and Scanning Mode (As per Technical Specifications attached in Annexure-P) for Pakal Dul HE Project, CVPPPL, Kishtwar, J&K

Corrigendum 1
Corrigendum Retender  NEW
30-May-2020 08-Jul-2020निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-150/2020/1248Collection of Gauge & Discharge data and water samples of Marusudar River for silt analysis and
silt analysis in sediment laboratory for two-year period at Dam site of Pakal Dul HE Project,
CVPPPL, Kishtwar, J&K.

Corrigendum 1  NEW
11-May-2020 05-Jun-2020निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-149/2020/1247“Purchase of Firewall for Pakal Dul HE Project, CVPPPL, Kishtwar, J&K”.

Corrigendum 1
Corrigendum 2
Cancellation Notice  NEW
11-May-2020 04-Jul-2020निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-148/2020/1246“Supply of 200 Nos. of Steel Dust Bin (40 Ltr capacity) to be issued to Municipal Committee, Kishtwar under R&R Plan of Pakal Dul HE Project, CVPPPL, kishtwar, J&K”.

Corrigendum 1
Cancellation Notice  NEW
11-May-2020 06-Jun-2020निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-147/2020/1237Collection of Gauge & Discharge data and water samples of Marusudar River at Dam site of Pakal
Dul HE Project for silt analysis and silt analysis in sediment laboratory for two year period.

Cancellation Order  NEW
18-Mar-2020 17-Apr-2020निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-145/2020/1101Renovation/Repair of quarters hired from DPS in Semna & DSB Colony for use of Pakal Dul HE Project

Corrigendum-1  NEW
20-Jan-2020 19-Feb-2020निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-144/2019/1003Purchase of Furniture Items for Govt. Schools in District Kishtwar under CSR and Sustainability activity for FY 2019-20 for Pakal Dul HE Project, CVPPPL, Kishtwar, J&K

Corrigendum-1  NEW
21-Dec-2019 20-Jan-2020निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-143/2019/1002Purchase of Medical Equipment for District Hospital Kishtwar under CSR and Sustainability activity for FY 2019-20 for Pakal Dul HE Project, CVPPPL, Kishtwar, J&K
21-Dec-2019 13-Jan-2020निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-141/2019/905Collection of Gauge & Discharge data and water samples of Marusudar river at Dam site of Pakal Dul HE Project for silt analysis and silt analysis in sediment laboratory for two year period

Cancellation Notice  NEW
16-Nov-2019 17-Dec-2019निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-142/2019/976Estimate for Office Pantry, Service Room, Store, Washroom & CGM Secretariat, Pakal Dul HE Project.
06-Dec-2019 23-Dec-2019निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-140/2019Disposal of Old & Used Vehicles, Equipment and its spare parts of Pakal Dul HE Project, CVPPPL, Kishtwar, J&K As is where is basis

Corrigendum-1
Corrigendum-2
Corrigendum 3
Corrigendum 4
Cancellation Notice  NEW
27-Nov-2019 11-Mar-2020निविदाएं बंद
2019_CVPP_513324_1Engagement of Consultant for Evaluation of Technical Bids of HRT-TBM Package of Pakal Dul HE Project
04-Nov-2019 01-Nov-2019निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-139/2019/783R&M of Mess at D-5 Accommodation, Field Hostel, Ikhala Camp, Bachelor Accommodation and Pantry in Office Building including Cleaning and Sweeping of Field Hostel Rooms (inside and outside area), Lawns, Bathrooms, Open Area, Roads, D-5 Accommodation, Field Hostel, Ikhala Camp & Office Building etc of Pakal Dul HE Project, CVPPPL, Kishtwar, J&K

Corrigendum-I  NEW
11-Oct-2019 11-Nov-2019निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-137/2019/723Operation and Maintenance of 2x6.3 MVA, 33/11 KV Substation at DUL Tamruchi for the period of One Year-(Service Part Only)

Corrigendum-1
Corrigendum-2  NEW
10-Oct-2019 06-Dec-2019निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-138/2019/727Internal Electrical Wiring of Gym for Pakal Dul HE Project, CVPPPL, Kishtwar, J&K

Corrigendum-1  NEW
10-Oct-2019 09-Dec-2019निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-136/2019/722Supply and Installation of Computers, UPS and Printers for Pakal Dul HE Project, Kishtwar

Corrigendum-1  NEW
09-Oct-2019 14-Nov-2019निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-132/2019/563Construction of Field Hostel along with Mess and Recreation Facilities for Executive & Non Executive''s at Power House Site of Pakal Dul HE Project, CVPPPL, Kishtwar, J&K
30-Sep-2019 02-Nov-2019निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-135/2019/693Purchase of Automatic Reflector Less Electronic Total Station (As per Technical Specifications attached in Annexure-1) for Pakal Dul HE Project, Kishtwar, J&K

Corrigendum-1
Corrigendum-2  NEW
23-Sep-2019 06-Dec-2019निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-131/2019/653Construction of Prefabricated site office, Bachelor Residential Units and mess cum canteen hall at Dam site for Pakal Dul HE Project, Kishtwar, J&K.

Corrigendum-1
Corrigendum-2
Corrigendum-3  NEW
13-Sep-2019 27-Nov-2019निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-134/2019/590Supply and Installation of LED TV for Pakal Dul HE Project, CVPPPL, Kishtwar, J&K

Corrigendum-1  NEW
14-Sep-2019 31-Oct-2019निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-129/2019/652Purchase of AutoCAD 3D Civil 2019 Software for Pakal Dul H.E. Project, CVPPPL, Kishtwar, J&K

Corrigendum-1
Corrigendum-2
Corrigendum-3
Corrigendum-4
Corrigendum-5  NEW
16-Sep-2019 18-Jan-2020निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-133/2019/589Supply and Installation of electrical items for Pakal Dul HE Project, CVPPPL, Kishtwar, J&K

Corrigendum-1
Corrigendum-2  NEW
13-Sep-2019 02-Nov-2019निविदाएं बंद
CVPPPL/19-20/ET/1Engineering,Procurement and Construction of Two Circular Shaped Head Race Tunnels of Length 7.35Km each to be excavated by two new independent TBMs and Associated Works for Pakal Dul Hydroelectric Project,J&K

Corrigendum-1
Corrigendum-2
Corrigendum-3
Corrigendum-4  NEW
13-Sep-2019 20-Nov-2019निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-130/2019/554Renovation/Repair of Govt. Middle School building at Arzi (Kwartanji) Zone Nagseni, Kishtwar for use of Pakal Dul HE Project, Kishtwar

Corrigendum-1
Corrigendum-2  NEW
02-Aug-2019 24-Sep-2019निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-128/2019/511Supply of water through water tanker (8000 Litre) at Hotel Hayat, Malipath, Kishtwar for a period of one year.
17-Jul-2019 02-Aug-2019निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-127/2019/490Supply of 150 Nos. Solar Lights and 200 Nos. of Steel Dust Bin to issue Municipal Committee, Kishtwar under R&R Plan of the project.
06-Jul-2019 03-Aug-2019निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-123/2019/375Renovation/Repair of Office Complex Block 2 and construction of CGI Shed/Room in DSB Colony for Pakal Dul HE Project, CVPPPL, Kishtwar, J&K

Corrigendum 1  NEW
15-Jun-2019 20-Jul-2019निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-126/2019/469Renovation/Repair of Govt. middle school building at Arzi (Kwartanji) Zone Nagseni, Kishtwar for use of Pakal Dul HE Project, Kishtwar

Cancellation of Tender  NEW
02-Jul-2019 31-Jul-2019निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-124/2019/419Purchase of work centre printers (MFP) and Peripherals for Pakal Dul H.E. Project, CVPPPL, Kishtwar, J&K
20-Jun-2019 20-Jul-2019निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-125/2019/436R&M of Mess at D-5 Accomodation, Field Hostel, Ikhala Camp, Bachelor Accomodation and Pantry in Office Building including cleaning and sweeping of Field hostel rooms (inside and outside area), Lawns, Bathrooms, Open area, roads, D-5 Accomodation, Field Hostel, Ikhala Camp & Office Building etc of Pakal Dul HE Project, CVPPPL, Kishtwar, J&K
21-Jun-2019 20-Jul-2019निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-122/2019/363Internal Electric Wiring of CGM office complex II/Geology Building (Remaining portion) of Pakal Dul HE Project, CVPPPL, Kishtwar, J&K

Corrigendum 1  NEW
05-Jun-2019 11-Jul-2019निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-121/2019/350Supply, Erection/Installation, Testing & Commissioning of 02 Nos. DG Sets of 62.5 KVA, 01 No. DG Set of 125 KVA & 01 no. DG Set of 20 KVA Capacity at different locations for use of Pakal Dul HE project, Kishtwar (J&K)
04-Jun-2019 26-Jun-2019निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-120/301Providing of Services for facilitating the smooth functioning of office work of Pakal Dul Hydroelectric Project, CVPPPL, Kishtwar, J&K for one-year period
21-May-2019 06-Jun-2019निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-119/299R&M of Bachelor Accomodation at Hotel Hayat Kishtwar including R&M of mess, sweeping & cleaning of building including R&M of electrical, water supply system & watch & ward of Pakal Dul HE project, CVPPPL, Kishtwar, J&K for one year period

Corrigendum 1  NEW
20-May-2019 07-Jun-2019निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-118/2019/296Hiring of 04 Nos. Tata Sumo Gold EX BS IV for Pakal Dul HE Project, CVPP[P] Limited, Kishtwar for a period of two (02) years

Corrigendum 1  NEW
20-May-2019 06-Jul-2019निविदाएं बंद
CVPP/PDHEP/C&P/NIT-116/2019/279Internal Electric Wiring of CGM office complex II/Geology Building (left side) of Pakal Dul HE Project, CVPPPL, Kishtwar, J&K
14-May-2019 30-May-2019निविदाएं बंद
CVPP/PDHEP/C&P/NIT-117/2019/282Construction of septic tank & soak pit for site office cum field hostel at Drungdhuran Dam site of Pakal Dul Hydroelectric Project, CVPPPL, Kishtwar, J&K
15-May-2019 14-Jun-2019निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-115/2019/238Hiring of 03 Nos. Mahindra Scorpio S7 for Pakal Dul HE Project, CVPP[P] Limited, Kishtwar for a period of two (02) years.
29-Apr-2019 13-May-2019निविदाएं बंद
CVPP/PDHEP/C&P/NIT-113/2019/102Construction of septic tank & soak pit for site office cum field hostel at Drungdhuran Dam Site of Pakal Dul Hydroelectric Project, CVPPPL, Kishtwar, J&K

Cancellation Notice  NEW
27-Mar-2019 24-Apr-2019निविदाएं बंद
CVPP/PDHEP/C&P/NIT-105/2019/127Construction of kitchen store in Transit Camp/Guest house of Pakal Dul Hydroelectric Project, CVPPPL, Kishtwar, J&K

Corrigendum-1  NEW
27-Mar-2019 27-Apr-2019निविदाएं बंद
CVPP/PDHEP/C&P/NIT-114/2019/128Internal Electrical Wiring of CGM Office complex II/ Geology Building (left side) of Pakal Dul HE Project, CVPPPL, Kishtwar, J&K

Corrigendum-1
Cancellation Notice  NEW
28-Mar-2019 25-Apr-2019निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-112/2019/83Hiring of 06 Nos. Tata Sumo Gold EX BS IV for Pakal Dul HE Project, CVPP[P] Limited, Kishtwar for a period of two (02) years
21-Feb-2019 16-Mar-2019निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-111/2019/82Hiring of 02 Nos. Force traveller BS IV (AC) Minibus for Pakal Dul HE Project, CVPP[P] Limited, Kishtwar for a period of two (02) years.
21-Feb-2019 16-Mar-2019निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-110/2019/81Hiring of 01 No. Mahindra Imperio (DC) BS IV for Pakal Dul HE Poject, CVPP[P] Limited, Kishtwar for a period of two (02) years.

Corrigendum-1  NEW
20-Feb-2019 14-Mar-2019निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-109/2019/80Hiring of 03 Nos. Mahindra Scorpio S7 for Pakal Dul HE Project, CVPP[P] Limited,Kishtwar for a period of two (02) years.

Cancellation Order  NEW
20-Feb-2019 14-Mar-2019निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-106/2019/55Supply, Erection, Testing & Commissioning of 1 No. (125 KVA capacity) DG Set for Pakal Dul H.E. Project, Kishtwar (J&K)

Corrigendum-1  NEW
14-Feb-2019 22-Mar-2019निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-108/65Providing of services for facilitating the smooth functioning of office work of Pakal Dul Hydroelectric Project, CVPPPL, Kishtwar, J&K for one year period

Cancellation Notice  NEW
12-Feb-2019 08-Mar-2019निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-104/2019/63Upkeeping of A&B type (Semna Colony) Field Hostel including sweeping, cleaning & providing mess services for Pakal Dul HE Project, CVPPPL, Kishtwar, J&K for one year period.
09-Feb-2019 02-Mar-2019निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-103/64R&M of Bachelor Accommodation at Hotel Hayat Kishtwar including R&M of mess, sweeping & cleaning of building including R&M of electrical, water supply system & watch & ward for Pakal Dul HE Project, CVPPPL, Kishtwar, J&K for one year period

Cancellation Notice  NEW
11-Feb-2019 07-Mar-2019निविदाएं बंद
CVPP/PakalDul/Bridge/2019Design and Construction of one no. approximately +- 97 meter clear span 70R double lane Steel Truss/Girder Bridge over river Chenab at Kwar(Dul),Kishtwar,J&K

Corrigendum-1
Corrigendum-2
Corrigendum-3
Corrigendum-4  NEW
18-Jan-2019 05-Mar-2019निविदाएं बंद
CVPPPL/PDHEP/C&P/NIT-102/2018/634Purchase of Computers, Laptops and Peripherals for Pakal Dul H.E. Project, CVPPPL, Kishtwar, J&K

Corrigendum-1  NEW
08-Dec-2018 08-Jan-2019निविदाएं बंद
CVPPPL/18-19/ET/1Engineering, Procurement and Construction of Two Circular Shaped Head Race Tunnels of Length 7.35 KM Each to be Excavated By Two New Independent TBMs and Associated Works for Pakal Dul HydroElectric Project, J&K

Corrigendum-1
Corrigendum-2
Corrigendum-3
Corrigendum-4
Corrigendum-5
Corrigendum-6
Corrigendum-7
Corrigendum-8
Cancellation Order  NEW
10-Dec-2018 05-Apr-2019निविदाएं बंद
CVPPPL/PDHEP/C&P/M(M)/NIT-99/2018/763Construction of Prefabricated site office, Bachelor Residential units and mess cum canteen hall at Dam site for Pakal Dul HE Project, Kishtwar, J&K

Corrigendum-1
Cancellation Notice  NEW
26-Nov-2018 29-Dec-2018निविदाएं बंद
CVPPPL/PDHEP/C&P/M(M)/NIT-98/2018/747Purchase & installation of Automatic Weather Station (As per Technical Specifications attached in Annexure-A) for Pakal Dul HE Project, CVPPPL, Kishtwar, J&K

Corrigendum-1
Corrigendum-2
Cancellation Notice  NEW
13-Nov-2018 15-Jan-2019निविदाएं बंद
CVPP/PDHEP/C&P/M(M)/NIT-101/2018/724Providing and Installation of water supply and sewage system for site offices at Power House site of Pakal Dul HE Project, (CVPPPL) Kishtwar, J&K
31-Oct-2018 22-Nov-2018निविदाएं बंद
CVPP/PDHEP/C&P/NIT-100/2018/694Fabrication and installation of 1:70 SCALE 3-D Model of Spillways (Surface & Tunnel Spillways) & Power Intake of Pakal Dul HE Project, CVPP[P] Ltd.,Kishtwar
22-Oct-2018 12-Nov-2018निविदाएं बंद
CVPP/PDHEP/C&P/M(M)/NIT-96/2018/667Fabrication and installation of 1:100 SCALE 3-D Model of Spillways (Surface & tunnel Spillways) & Power Intake for Reservoir Flushing of Pakal Dul HE Project, CVPP[P] Ltd.,Kishtwar
15-Oct-2018 09-Nov-2018निविदाएं बंद
CVPP/PDHEP/C&P/M(M)/NIT-89/2018/642Purchase & Installation of Reflectorless Electronic Total Station (As per Technical Specifications attached in Annexure-A { LEICA AUTOMATIC TOTAL STATION MODEL TS16 A 1" R1000}) for Pakal Dul HE Project, CVPPPL, Kishtwar, J&K

Corrigendum-1
Corrigendum-2
Cancellation Order  NEW
08-Oct-2018 03-Dec-2018निविदाएं बंद
CVPP/PDHEP/C&P/M(M)/NIT-84/2018/634Providing and Installation of water supply and sewage system for site offices at Power House site of Pakal Dul HE Project, (CVPPPL) Kishtwar, J&K

Cancellation Order  NEW
28-Sep-2018 19-Oct-2018निविदाएं बंद
CVPP/PDHEP/C&P/M(M)/NIT-97/2018/631Internal Electrical Wiring of Office blocks at power house Site of Pakal Dul HE Project, CVPPPL,Kishtwar,J&K
26-Sep-2018 15-Oct-2018निविदाएं बंद
CVPP/PDHEP/C&P/M(M)/NIT-92/2018/591Wooden Flooring, Roofing (Falseceling), Dismantling existing old tiles, Painting of GI Roof sheet, Exterior Painting and Sanitary Installation in washroom of Transit Camp of Pakal Dul HE Project, CVPPPL, Kishtwar, J&K
18-Sep-2018 16-Oct-2018निविदाएं बंद
CVPP/PDHEP/C&P/M)M)/NIT-85/2018/587Supply, Erection, Testing & Commissioning of 2 Nos. (50KVA capacity each) DG Set and 2 Nos. (20KVA capacity each) DG Set for power backup in Offices at dam Site (Drangdhuran) and power house site (DUL) of pakal Dul H.E. Project, CVPPPL, Kishtwar, J&K

Corrigendum-1
Corrigendum-2  NEW
13-Sep-2018 20-Oct-2018निविदाएं बंद
CVPP/C&P/Pakal Dul/HM-Pkg/2018Design, Procurement, Manufacture, Inspection, Shop Assembly, Testing, Painting, Transportation, Site Storage & Site Erection, Testing & Commissioning of Radial Gates, Vertical gates, Stoplogs, Gantry Cranes, Trashracks, Steel Liner for Pressure Shafts of Pakal Dul HE Project

Corrigendum-1
Corrigendum-2
Reply to Pre Bid Queries dt: 23.10.2018  NEW
31-Aug-2018 25-Oct-2018निविदाएं बंद
CVPP/PDHEP/C&P/M(M)/NIT-90/2018/575Internal Electric Wiring of Office Blocks at Power House Site of Pakal Dul HE Project, CVPPPL, Kishtwar, J&K
14-Aug-2018 07-Sep-2018निविदाएं बंद
CVPP/PDHEP/C&P/M(M)/NIT-91/2018/441Placing of Foundation stone at Power House site of Pakal Dul H E Project at Tamruchi Junction - Construction of Platform and development of area thereof for CVPPPL, Kishtwar, J&K

Corrigendum-1  NEW
04-Aug-2018 01-Sep-2018निविदाएं बंद
CVPP/PDHEP/C&P/M(M)/NIT-93/2018/419Fabrication and Installation of 1:70 SCALE 3-D Model of Spillways (Surface & Tunnel Spillways) & Power Intake of Pakal Dul HE Project, CVPP[P] Ltd.,Kishtwar

Corrigendum-1
Corrigendum-2  NEW
01-Aug-2018 03-Sep-2018निविदाएं बंद
CVPP/PDHEP/C&P/M(M)/NIT-78/2018/359Water Supply for Dam Site Guest House Complex and site office complex at Drungduran under Pakal Dul HE Project, (CVPPL) Kishtwar, J&K
09-Jul-2018 30-Jul-2018निविदाएं बंद
CVPP/PDHEP/C&P/NIT-87/2018/325Fabrication and installation of 3-d model of spillways (surface and tunnel spillways) & power intake of Pakal Dul HE Project, CVPP (P) Ltd, Kishtwar, J&K

Corrigendum-1  NEW
28-Jun-2018 19-Jul-2018निविदाएं बंद
CVPP/PDHEP/C&P/M(M)/NIT-86/2018/297Construction of approaches on left and right bank of river Chenab for Bhandarkot Bridge by way of Earthwork in cutting, filling and walling for Pakal Dul HE Project, Kishtwar, J&K
21-Jun-2018 19-Jul-2018निविदाएं बंद
CVPP/PDHEP/C&P/M(M)/NIT-81/2018/128R&M of Mess at D-5 accomodation, Field Hostel, Ikhala Camp, A-Type & B-Type Bachelor Accomodation including Cleaning and Sweeping of office Building, Field Hostel, D-5 inside and outside areas etc. of Pakal Dul H.E Project Kishtwar for the period of one year.
02-May-2018 22-May-2018निविदाएं बंद
CVPP/PDHEP/C&P/M(M)/NIT-83/2018/63Construction of Security Barracks for security personals at Power House site near Gratalan Nallah along the MAT road of Pakal Dul HE Project, CVPP, Kishtwar, J&K

Cancellation Order  NEW
17-Apr-2018 14-May-2018निविदाएं बंद
CVPP/PDHEP/C&P/M(M)/NIT-82/2018/23Construction of Site office (temporary) including Bench development at Power House site near Gratalan Nallah along the MAT road of Pakal Dul HE Project,CVPP,Kishtwar,J&K
09-Apr-2018 01-May-2018निविदाएं बंद
CVPP/PDHEP/C&P/M(M)/NIT-80/2018/1476Construction of level platform for layout of prefabricated shelters for office accomodation and security barrack at Drungdhuran of Pakal Dul HE Project, CVPP, Kishtwar, J&K

Corrigendum-1  NEW
24-Mar-2018 16-Apr-2018निविदाएं बंद
CVPP/PDHEP/C&P/M(M)/NIT-79/2018/1475Construction of balance work of realignment of by pass road for Gangaidad Zigs of kishtwar- Bhandarkot road stretch by way of cutting, protection work and cross drainages, PACKAGE A (RD118/750 to 119/550) & PACKAGE B (RD119/550 to RD 120/50) (As per Annexure R) for Pakal Dul HE Project, CVPP, Kishtwar (J&K)

Corrigendum-1  NEW
24-Mar-2018 14-Apr-2018निविदाएं बंद
CVPP/PDHEP/C&P/M(M)/NIT-77/2018/1385Supply of Wooden Chassis for 320 feet, Bailey Suspension Bridge (BSB) at Power House site of Pakal Dul HE Project, CVPPPL, Kishtwar, J&K
24-Feb-2018 21-Mar-2018निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/2018/NIT-75/1284Disposal of Old & used vehicles against NIT exclusively for the employees posted in CVPP (Including retired/voluntary retired) on "As is where is" Basis at Pakal Dul HE Project,CVPPPL,Kishtwar,J&K".
22-Jan-2018 12-Feb-2018निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-74/2018/1239R&M of Mess at D-5 accomodation, Field Hostel, Ikhala camp, A-Type & B-Type Bachelor acomodation including Cleaning and Sweeping of office building, field hostel, D-5 inside and outside areas etc. of Pakal dul H.E Project Kishtwar for the period of one year.

Corrigendum-I  NEW
11-Jan-2018 15-Feb-2018निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-73/2017-18/1171Purchase & Installation of Automatic Weather Station (As per Technical Specifications attached in Annexure-A) for Pakal Dul HE Project, CVPPPL, Kishtwar, J&K

Cancellation Order  NEW
04-Jan-2018 03-Feb-2018निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-72/2017-18/1147Purchase of Desktop Computers (As per Annexure-A) for Pakal Dul HE Project, CVPPPL, Kishtwar, J&K

Corrigendum-1  NEW
14-Dec-2017 27-Jan-2018निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-71/2017-18/1037Construction of Portal of Main Access Tunnel (MAT) in Power House Area of Pakal Dul HE Project, CVPPL, Kishtwar, J&K
09-Dec-2017 02-Jan-2018निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-70/2017-18/1094/1125Collection of Gauge & Discharge data, collection of water samples at Drangdhuran Gauge site and sediment analysis of water in sediment Lab for PDHEP Kishtwar for a period of two years.

Corrigendum-1  NEW
06-Dec-2017 10-Jan-2018निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-56/2017-18/1124Supply of Wooden Chassis for 320 feet, Bailey Suspension bridge (BSB) at Power House site of Pakal Dul HE Project, CVPPPL. Kishtwar, J&K
05-Dec-2017 01-Jan-2018निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-69/2017-18/1031Hiring of One No. Toyota Innova Crysta 2.4 GX 7 STR at Pakal Dul HE Project, CVPPP Limited, Kishtwar, for a period of two years.
31-Oct-2017 18-Nov-2017निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-68/2017-18/1025Hiring of 06 No.''s Tata Sumo Gold EX BS IV for Pakal Dul HE Project, CVPPP Limited, Kishtwar, for a period of two years.
28-Oct-2017 18-Nov-2017निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-67/2017-18/1023"Hiring of One No. Mahindra Scorpio S6 Plus Intelli Hybrid for Pakal Dul HE Project, CVPPP Limited, Kishtwar, J&K for a period of two years."

Corrigendum-1  NEW
27-Oct-2017 18-Nov-2017निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-66/2017-18/920"Hiring of 06 No''s Tata Sumo Gold EX BS IV for Pakal Dul HE Project, CVPPP Limited, Kishtwar, for a period of two years."
14-Sep-2017 28-Sep-2017निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-65/2017-18/919"Hiring of One No. Tata Safari Storme 2.2VX 4x2 Varicor 400 for Pakal Dul HE Project, CVPPP Limited, Kishtwar, for a period of two years."
15-Sep-2017 28-Sep-2017निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-64/2017-18/918"Hiring of One No. Mahindra Scorpio S6 Plus Intelli-Hybrid for Pakal Dul HE Project, CVPPP Limited, Kishtwar, J&K for a period of two years."
14-Sep-2017 28-Sep-2017निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-63/2017-18/917"Hiring of One No. Toyota Innova Crysta 2.4 GX 7 STR at Pakal Dul HE Project, CVPPP Limited, Kishtwar, for a period of two years."
14-Sep-2017 28-Sep-2017निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-55/2017-18/595Construction of Diversion Tunnel Outlet Road (RD 0.0 to RD 1200.00)m by way of earth cutting at Dam site of Pakal Dul HE Project (Package- E to H)

Corrigendum-1
Corrigendum-2  NEW
29-Jun-2017 21-Jul-2017निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-54/2017-18/594Construction of Diversion Tunnel Inlet (RD 0.0 to RD 4250)m by way of earth cutting at Dam site of Pakal Dul HE Project (Package-A to D)

Corrigendum-1  NEW
29-Jun-2017 21-Jul-2017निविदाएं बंद
CVPP/Cont-II/Pakal Dul/E&M-PKG/2017Design, Manufacturing, Supply, Transportation, Erection, Testing and Commissioning of 4 x 250 MW Francis Turbine Generator units, complete in all respects along with associated auxiliaries and ancillary equipment and switchyard with all equipment etc. of 4 x 250 MW Pakal Dul Hydroelectric Project.

Corrigendum-1
Corrigendum-2
Reply to Pre Bid Queries
Corrigendum-3
Corrigendum-4
Corrigendum-5
Corrigendum-6
Corrigendum-7  NEW
29-Jun-2017 14-Dec-2017निविदाएं बंद
CVPP/C&P/Pakal Dul/HM-PKG/2017Design, Procurement, Manufacture, Inspection, Shop Assembly, Testing, Painting, Transportation, Site Storage & Site Erection, Testing & Commissioning of Radial Gates, Vertical Gates, Stoplogs, Gantry Cranes, Trashracks, Trashrack Cleaning Machine, Steel Liner for Pressure Shafts of Pakal Dul HE Project.

Corrigendum-1
Corrigendum-2
Corrigendum-3
Pre Bid Queries
Corrigendum-4
Corrigendum-5
Corrigendum-6
Corrigendum-7
Corrigendum-8
Abbundum to Corrigendum 7  NEW
21-Jun-2017 08-Dec-2017निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT- 53/2017-18/427Installation of Display Boards including fabrication, erection & writing at different locations of Pakal Dul HE Project, CVPP, Kishtwar (J&K)
19-Jun-2017 11-Jul-2017निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT- 52/2017-18/376Making seating arrangement by partitioning of hall for office at Pakal Dul HE Project (CVPPL) at Kishtwar, J&K
14-Jun-2017 06-Jul-2017निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT- 51/2017-18/368Diamond core drilling including driving, ramming of drill holes for lowering of casing of NX & HX size for 2 Nos one of +(-) 167.70 mtrs (DD-16) & other of +(-) 179.20 (DD-17) mtrs depth including core preservation water percolation test as per GSI recommendation and relevant IS codes at every 1.50m interval in all types of strata at left bank of Dam site on the tunnel spillway alignment of Pakal Dul HE Project, Kishtwar.
13-Jun-2017 28-Jun-2017निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT- 48/2017-18/209Installation of Display Boards including fabrication, erection & writing at different locations of Pakal Dul HE Project, CVPP, Kishtwar (J&K)
17-May-2017 07-Jun-2017निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-47/2017-18/105Tata Sumo Gold EX BS-IV or Higher (Model 2017 or New) alongwith driver for Pakal Dul H E Project Office Kishtwar (J&K), Package-6 for a period of two (2) years.

Corrigendum-1
Corrigendum-2
Corrigendum-3  NEW
25-Apr-2017 31-May-2017निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-46/2017-18/104Tata Sumo Gold EX BS-IV or Higher (Model 2017 or New) alongwith driver for Pakal Dul H E Project Office Kishtwar (J&K), Package-5 for a period of two (2) years.

Corrigendum-1
Corrigendum-2
Corrigendum-3  NEW
25-Apr-2017 31-May-2017निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-45/2017-18/103Tata Sumo Gold EX BS-IV or Higher (Model 2017 or New) alongwith driver for Pakal Dul H E Project Office Kishtwar (J&K), Package-4 for a period of two (2) years.

Corrigendum-1
Corrigendum-2
Corrigendum-3  NEW
25-Apr-2017 31-May-2017निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-44/2017-18/102Hiring of Tata Safari Storme (2.2 LX 4X2) or higher version (Model 2017 or latest) along with driver for Pakal Dul H.E Project Office Kishtwar (J&K), Package-3 for the period of Two(2) years.

Corrigendum-1
Corrigendum-2
Corrigendum-3  NEW
25-Apr-2017 30-May-2017निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-43/2017-18/101Hiring of Tata Safari Storme (2.2 LX 4X2) or higher version (Model 2017 or latest) along with driver for Pakal Dul H.E Project Office Kishtwar (J&K), Package-2 for the period of Two(2) years.

Corrigendum-1
Corrigendum-2
Corrigendum-3  NEW
25-Apr-2017 30-May-2017निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-42/2017-18/100Hiring of Toyota Innova (Crysta 2.4 G7 STR) or higher version (Model 2017 or latest) along with driver for Pakal Dul H.E Project Office Kishtwar (J&K), Package-1 for the period of two years.

Corrigendum-1
Corrigendum-2
Corrigendum-3  NEW
25-Apr-2017 30-May-2017निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-41/2017/321Providing and Fixing of Cement Concrete Tiles, ailing on Stairs and Painting on Chain Link Fencing in Transit Camp Area of PDHEP, CVPP, Kishtwar (J&K)

Corrigendum-1  NEW
23-Mar-2017 13-Apr-2017निविदाएं बंद
CVPP/Pakal Dul/PH/2017Construction of Civil Works comprising of part Head Race Tunnels, Adits, Surge shafts, Pressure shafts, Valve House, Underground Power House, MIV cavern, Transformer Cavern, Adits and Access tunnels, Tail Race Tunnels, TRT outlet structure and Pothead yard etc. of Pakal Dul H.E Project J&K

Corrigendum-1
Corrigendum-2
Corrigendum-3
Corrigendum-4
Corrigendum-5
Corrigendum-6
Corrigendum-7  NEW
14-Mar-2017 17-Aug-2017निविदाएं बंद
CVPP/Pakal Dul/Dam Pckg/2017Construction of Diversion Tunnel (along with HM works), Concrete Face Rockfill Dam(CFRD), Surface & Tunnel Spillway, Intake Structure, Two nos part Head Race Tunnel and Allied Structures of Pakal Dul H.E Project (1000 MW)

Corrigendum-I
Corrigendum-II
Corrigendum-III
Corrigendum-IV
Corrigendum-V
Corrigendum-VI
Corrigendum-VII
Corrigendum-VIII
Corrigendum-IX
Corrigendum-X
Corrigendum-XI
Corrigendum-XII
Corrigendum-XIII
Corrigendum-XIV
Corrigendum-XV
Corrigendum-XVI
Corrigendum-XVII
Corrigendum-XVIII  NEW
14-Mar-2017 06-Nov-2017निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-40/2017/115Construction of Attached Toilets & Extension of GS Sheet Roofing of PDHEP office at Kishtwar.
01-Mar-2017 21-Mar-2017निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-39/2017/58Construction of Diversion Tunnel Inlet Road (RD 0.0 to RD 4250)m and Outlet road (RD 0.0 to RD 1200)m by way of earth cutting at Dam site of Pakal Dul HE Project (Package A to H)

Extension in Tender Submission Date  NEW
03-Feb-2017 27-Feb-2017निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-38/2016/567Renovation of Explosive Magazines taken over from DPS, NHPC at Dul for Pakal Dul H.E. Project, CVPP Kishtwar.
02-Jan-2017 30-Jan-2017निविदाएं बंद
CVPP/PDHEP/M(C)/P&C/NIT-37/2016/552Renovation of Villa 57 and 58, taken over from DPS, NHPC for Pakal Dul H.E. Project, CVPP Kishtwar.
22-Dec-2016 16-Jan-2017निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-33/2016/331Cross-Section from deepest river bed level to 5m above from Highest Flood Level (HFL) on both banks of River Marusudhar for Diversion Tunnel (DT) of Pakal Dul H.E Project, Kishtwar.
01-Oct-2016 25-Oct-2016निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-34/2016/332Renovation of Villa 57 and 58 taken over from DPS, NHPC for Pakal Dul H.E. Project, CVPP Kishtwar.
01-Oct-2016 25-Oct-2016निविदाएं बंद
CVPP/PDHEP/M(C)/P&C/NIT-32/2016/322Hiring of 01 No. Mahindra Scorpio for 02 months in Pakal dul H.E Project, Kishtwar (not more than 03 year old)

Corrigendum-1  NEW
26-Sep-2016 06-Oct-2016निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-28/2016/21Collection of Gauge & Discharge data, collection of water samples at Drangdhuran Gauge site and sediment analysis in Sediment Lab for a period of One Year for Pakal Dul HE Project.
25-Apr-2016 25-May-2016निविदाएं बंद
CVPP/Pakal Dul/HRT-Pckg/2016Design and Construction of 2 nos. circular shaped Head Race Tunnels of length 7350 m each to be excavated by two new independent TBMs and Associated works for Pakal Dul HE Project.

Corrigendum-I
Corrigendum-II
Corrigendum-III
Corrigendum-IV
Corrigendum-V
Corrigendum-VI
Corrigendum-VII
Corrigendum-VIII
Corrigendum-IX
Corrigendum-X
Corrigendum-XI
Corrigendum-XII
Corrigendum-XIII
Corrigendum-XIV
Corrigendum-XV
Corrigendum-XVI
Corrigendum-XVII
Corrigendum-XVIII
Cancellation Notice  NEW
30-Jan-2017--
CVPP/Pakal Dul/DT/2016Construction of Diversion Tunnel (along with HM works) of Pakal Dul Hydroelectric Project.

Corrigendum-I
Corrigendum -II
Corrigendum-III
Corrigendum-IV
Corrigendum-V
Corrigendum-VI
Corrigendum-VII
Corrigendum-VIII
Cancellation Notice  NEW
14-Mar-2016 22-Apr-2016निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-27/2015/58-64Construction of road to connect DT outlet on the downstream side taken off from PWD road near village Pinjrari,RD 900-1200.(Pkg.D)

Corrigendum-I
Corrigendum-II
Corrigendum-III  NEW
01-Jan-2016 09-Mar-2016निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-26/2015/58-64Construction of road to connect DT outlet on the downstream side taken off from PWD road near village Pinjrari,RD 600-900.Pkg-C

Corrigendum-I
Corrigendum-II
Corrigendum-III  NEW
01-Jan-2016 09-Mar-2016निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-25/2015/58-64Construction of road to connect DT outlet on the downstream side taken off from PWD road near village Pinjrari,RD 300-600.Pkg-B

Corrigendum-I
Corrigendum-II
Corrigendum-III  NEW
01-Jan-2016 09-Mar-2016निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-24/2015/58-64Construction of road to connect DT outlet on the downstream side taken off from PWD road near village Pinjrari,RD 0-300.Pkg-A

Corrigendum-I
Corrigendum-II
Corrigendum-III  NEW
01-Jan-2016 09-Mar-2016निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-23/2015/708Providing protection work of uphill side,D/s of left anchor blocks along the road and catch water drain on both side of bridge at Power House site of Pakal Dul HE Project.
12-Dec-2015 12-Jan-2016निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-22/2015/707Providing protection work of towers and allied additional work around of Bailey Suspension Bridge at Power House site of Pakal Dul HE Project.
12-Dec-2015 12-Jan-2016निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-21/2015/706Providing protection on left side area over anchor block and cables protections work of Bailey suspension bridge at Power House site of Pakal Dul HE Project.
12-Dec-2015 12-Jan-2016निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-17/2015/702Construction of road (5m/7m) by of earth cutting from Baily Suspension Bridge (Bifurcation point RD 0/606.0m/0.00m) to Gratalan nala upto (RD 1960.0m) at Power house site of Pakal Dul H.E Project (pkg-01).

Amendment no-I
Amendment no-II  NEW
21-Sep-2015 03-Nov-2015निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-20/2015/705Construction of road (5m/7m) by way of earth cutting from TBM Adit (RD 5.71Km) to Gratalan nala upto RD (5/00Km) at Power house site of Pakal Dul H.E Project,(Pkg-04).

Amendment no-I
Amendment no-II  NEW
21-Sep-2015 03-Nov-2015निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-19/2015/704Construction of road (5m/7m) by way of earth cutting from Gratalan nala (RD 3890.0m) to TBM Adit upto RD (5/00Km) at Power House site of Pakal Dul H.E Project,(Pkg-03).

Amendment no-I
Amendment No-II  NEW
21-Sep-2015 03-Nov-2015निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-18/2015/703Construction of road (5m/7m) by way of earth cutting from Gratalan nala (RD 3890.0m) to Bailey Suspension Bridge Bifurcation point up to (RD 1960.0m) at Power house site of Pakal Dul H.E Project.(Pkg-02).

Amendment no-I
Amendment no-II  NEW
21-Sep-2015 03-Nov-2015निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-16/2015/701Construction of Road from Bailey Suspension Bridge to MAT of Power House Site at Dul.

Amendment no.I
Amendment no.II
Amendment no-III
Amendment-IV  NEW
24-Aug-2015 03-Nov-2015निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-15/2015/700Renovation of Residential Quarters at Shalimar Colony
24-Aug-2015 15-Sep-2015निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-14/2015/635Providing protection work of uphill side of CVPP(P) Dul colony around water tank area at Power house site of Pakal Dul H.E. Project.
23-Feb-2015 16-Mar-2015निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-13/2015/629Repair and Renovation of Toilet Block(Civil work including carriages Water supply,Sanitary Fitting and Electric Fitting) in the leased accomodation at Ikhala under Pakal Dul HE Project(CVPPL),Kishtwar.
23-Feb-2015 16-Mar-2015निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-12/2014/468Upkeeping/R&M of Field hostel, Toilets/Bathrooms, Canteen (inside & outside area),Dustbins, Drains etc. including dusting of Furniture & Fixtures for Pakal Dul HE project for the period of one year.

Corrigendum-I
Corrigendum-II  NEW
04-Aug-2014 22-Sep-2014निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-11/2014/467Cleaning and sweeping of Office complex including Technical Building, and Toilets/Bathrooms, Canteen(inside and outside area),Drains including dusting of furniture & fixtures etc. for Pakal Dul HE Project, Kishtwar for the period of one year.

Corrigendum-I
Corrigendum-II  NEW
04-Aug-2014 22-Sep-2014निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/ NIT-05/2014/437Repair and maintenance of Magazine along with security morcha & c/o new step for approach to the magazine site from Tamruchi junction point to Power House site of Pakal Dul H.E. Project.
09-Aug-2014 29-Aug-2014निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/ NIT-10/2014/466Collection of Gauge & Discharge data and water sample at Drangdhuran gauge site and sediment sample analysis in sediment lab for the period of one year.

CORRIGENDUM-I  NEW
08-Aug-2014 28-Aug-2014निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/ NIT-06/2014/438Repair and maintenance of path leading to portable Magazine including clearing of jungle around magazine at Ikhala (Dam site) of Pakal Dul H.E. Project.
09-Aug-2014 29-Aug-2014निविदाएं बंद
CVPP/Dulhasti-II/P&C/M(C)/Survey/NIT-09/2014/465Collection of Gauge & Discharge data at TRT oulet site on Chenab river at Benzwar for period of one year of Dulhasti (Stage-II) HE project.

CORRIGENDUM-1  NEW
08-Aug-2014 28-Aug-2014निविदाएं बंद
CVPP/Dulhasti-II/P&C/M(C)/Survey/NIT-08/2014/464Cross -sections of Chenab river around TRT outlet of Dulhasti(Stage-II) project to TRT of Dul-Hasti Power Station.

CORRIGENDUM-1  NEW
07-Aug-2014 11-Sep-2014निविदाएं बंद
CVPP/PDHEP/SM(C)/NIT-02/14/650Hiring of Vehicle one No. "TATA Safari Storm- Ex (Model 2014 or Brand New.)

Extension NIT-01
Extension of NIT for "Hiring of No Tata Safari Storm-Ex for Pakal Dul H.E. Project,Kishtwar for a period of Two years"
Extension NIT-02
Extension of NIT for "Hiring of No Tata Safari Storm-Ex for Pakal Dul H.E. Project,Kishtwar for a period of Two years.  NEW
21-Jul-2014 01-Oct-2014निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-07/2014/451Construction of 06 Nos. of seismic vaults for MEQ Studies for housing Broad Band Seismographs for Kiru,Kwar & Pakal Dul. HE Projects,CVPP Ltd.at Puhi,Patharnaki,Chattroo,Drangdhuran,Gundoh and Doda.
16-Jul-2014 31-Jul-2014निविदाएं बंद
CVPP/PDHEP/SM(C)/NIT-02/14/21Hiring Of Vehicles ( make and model : One No. "TATA Safari Storm -Ex "( Model 2014 or Brand New )

Cancellation Notice  NEW
16-Jun-2014 07-Jul-2014निविदाएं बंद
CVPP/Dul Hasti II/P&C/M(C)/Survey/NIT-04/2014/352Topographical Survey Including Control Survey of Power House Area of Dul Hasti II HE Project

CORRIGENDUM-01
CORRIGENDUM - 02  NEW
10-Apr-2014 12-May-2014निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-03/2014/351Repair and Maintenance of Executive Rooms from Room No. 1 to Room No. 31 & club inclusive of Civil and Electrical Works at Dul for Pakal Dul HE Project, CVPPL Kishtwar.

CORRIGENDUM 01
CORRIGENDUM 02
CORRIGENDUM-03
CORRIGENDUM-4
CORRIGENDUM-05
CORRIGENDUM-06  NEW
10-Apr-2014 17-Nov-2014निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-02/2014/300Improvement/Construction of approach road leading to Bailey Suspension Bridges by way of earth work in cutting on Log Boom Road from RD+-1/625 to RD +-1/925 at Power House site of Pakal Dul HE Project at Dul,Kishtwar.
11-Feb-2014 03-Mar-2014निविदाएं बंद
CVPP/PDHEP/P&C/M(C)/NIT-01/2014/263Construction of 2.0 m Portal and Heading Drift of 5.0 m dia in 10.0 m length for construction of access tunnel to Power House via Dul Dam.

WEBSITE CORRIGENDUM
CORRIGENDUM-I
CORRIGENDUM-2  NEW
21-Jan-2014 04-Mar-2014निविदाएं बंद
CVPPL/PDHEP/Mgr.(Proc)/2013/158Hiring of Vehicle(Model 2013 or New) One No. Tata Safari Dicor 2.2 VX 4x4 & Three Nos. Tata Sumo Gold Ex (Model 2013 or New) for Pakal Dul H.E. Project, CVPP Kishtwar J&K.

CORRIGENDUM- I
AMENDED NIT
CORRIGENDUM - II
CORRIGENDUM-III
CORRIGENDUM-IV
CORRIGENDUM-V
CORRIGENDUM-VI
CORRIGENDUM-VII  NEW
28-Sep-2013 06-Mar-2014निविदाएं बंद
CVPPL/PDHEP/M(Proc.)/2013/02/124-129Supply and installation/laying of Local Area Networking(LAN) for technical Building og CVPP Pakal Dul HE Project Kishtwar J&K.
20-Sep-2013 17-Oct-2013निविदाएं बंद
CVPP/PD/MW/RB/TK /2013Invitation of Bids(International Competitive Bidding) for Turnkey mode of execution of Pakal Dul (Drangdhuran) Hydroelectric Project, 1000 MW.

CORRIGENDUM-1
CORRIGENDUM-2
CORRIGENDUM-3
CORRIGENDUM-4
CORRIGENDUM- 5
CORRIGENDUM-6
CORRIGENDUM-7
Cancellation of TurnkeyTender of Pakal Dul HE Project  NEW
19-Jun-2013 10-Jul-2013निविदाएं बंद
135to142Cleaning & sweeping of Office complex, inside and outside areas, Dusting of Furnitures & Fixtures including Up-keeping of Toilets/bathrooms, Dustbins, Drains, Consumables etc. for Pakal Dul HE project kishtwar for the period of 12 months
20-Apr-2013 07-May-2013निविदाएं बंद
143to150General Up Keeping and R & M of Transit Camp, Cleaning & Sweeping of Transit Camp inside and outside areas, Dusting of Furniture & Fixtures including up keeping of Toilets/Bathrooms, Dustbins, drains, canteen etc. for Pakal Dul HE Project for period of 12 month
20-Apr-2013 07-May-2013निविदाएं बंद

2013 से पहले जारी एनआईटी के लिए यहां क्लिक करें